Historical task source. The Eve task board holds current task state.
Critical review of TODOS/phase-180.md (180.C.01 → 180.C.30). For each gap,
the heading states the gap, the body states what the checklist has today, what
is missing, and what an ordered follow-up task would look like if added. Items
are organized by concern area, not by stage, because most gaps cut across
multiple stages.
Scope: this is a gap review, not a critique of checklist quality. The
sequencing, policy-first discipline, audit-before-mutation rule, and stub-ban
hygiene in 180.C.01/180.C.07/180.C.08 are strong and should be preserved.
1. Capability Surface — Platforms and Tools#
1.1 macOS-only host ignores the working surface of most studios#
- Has: Every host-side stage (
180.C.06,180.C.13,180.C.26) assumes macOS: TCC permissions, Keychain, LaunchAgent, notarization, menu-bar app. - Missing: Windows and Linux remote host. Blender and Unreal studios run predominantly on Windows workstations; render nodes usually run Linux. The phase title says "MacBook" but the broader vision ("Hetzner, AWS, or any other trusted compute environment") implies heterogeneous hosts.
- Follow-up: Add explicit stages for Windows host packaging (Services,
code-signing, UAC, Defender), Linux host packaging (systemd user units,
Wayland vs X11 screen capture, PipeWire), and a cross-platform
permission/discovery abstraction in
mac-host-runtime. Or scope the phase title down to macOS and defer other OSes to a future phase — but make the decision explicit.
1.2 DCC coverage stops at Blender and Unreal#
- Has: Deep adapters for Blender (
180.C.09/.10/.17/.18) and Unreal (180.C.15/.23/.24); generic browser and desktop fallback. - Missing: Maya, Houdini, Cinema 4D, Nuke, DaVinci Resolve, Substance
Painter/Designer, ZBrush, Photoshop/After Effects, Logic/Pro Tools/Ableton,
Figma desktop, Procreate. Desktop fallback can reach these but no structured
adapter path exists. The agent tool-selection policy in
180.C.14.10will collapse to "desktop fallback" for every non-Blender/Unreal DCC. - Follow-up: Add a generic Adapter SDK stage (see §5.4) so third parties and later phases can land Maya/Houdini/Substance/etc. without reopening the protocol. At minimum, name the "Tier 2 DCC" backlog explicitly so the Blender/Unreal rigor isn't misread as the full scope.
1.3 Audio/video/realtime pipelines are absent#
- Has: Render artifacts (
180.C.18.05,180.C.24.03), Movie Render Queue. - Missing: Audio workflows (DAW transport control, timecode sync, Pro
Tools/Logic session state), video editing (Resolve/Premiere timeline and
project queries), Live Link / virtual production control beyond the read-only
observation in
180.C.24.08, OCIO/ACES color management across DCCs, HDR stream handling, frame-accurate scrubbing. - Follow-up: Add a "Timecode, Color, and Media Pipeline" stage between
180.C.22and180.C.23; define anOCIOConfigReferenceshared schema; and mark audio DCC support as in-scope or out-of-scope explicitly.
1.4 No mobile or tablet host/observer#
- Has: Mobile observer/approval is a single bullet at
180.C.30.09— "after the desktop Control Room is stable." - Missing: Mobile doesn't need to wait for 30 stages to be useful — approving a deny/approve prompt from a phone is one of the highest-value operator moments. Voice ("Iris supervision") is buried in the same bullet.
- Follow-up: Pull approval-only mobile (PWA or native wrapper) into a
180.C.12.xor180.C.21.xsubstage so operators aren't tethered to a laptop just to approve an asset import.
1.5 Stream capabilities are thin#
- Has: WebRTC MVP (
180.C.12.07), source switching (180.C.21.03), overlays (180.C.21.04), TURN fallback (180.C.25.04). - Missing: HDR/wide-gamut stream, multi-display layout stream, hardware codec selection (VideoToolbox/NVENC), bandwidth-adaptive bitrate, audio stream (not just screen), cursor capture as separate track, region-of- interest encoding, stream recording with keyframe snapshot index for fast seeking, picture-in-picture on operator side, and zoom/pan on the viewport.
- Follow-up: Expand
180.C.12or add a dedicated streaming stage that enumerates codec, color, audio, multi-track, recording, and scrubbing.
1.6 Asset provenance has gaps around dependencies#
- Has: Artifact metadata, hashes, provenance links (
180.C.22.05), cross- app transfer flows (180.C.22.06–180.C.22.09). - Missing: Dependency graph for derived assets (if texture X is replaced, which Blender materials and Unreal material instances depend on it?), broken reference detection, upstream/downstream impact preview before edits.
- Follow-up: Add to
180.C.22or a new stage: asset dependency index, reference integrity queries, impact-preview command used by180.C.14.14dry-runs.
2. UX — Control Room and Operator Surface#
2.1 Operator onboarding is unspecified#
- Has: Host first-run onboarding is thorough (
180.C.26.03). - Missing: Operator-side first-run UX in the Control Room: empty states before any device is paired, guided pairing from the operator side, explanations of what "observe-only vs project write" means in plain language, and the "I just opened this; what do I do?" flow.
- Follow-up: Add to
180.C.12(MVP) and expand in180.C.21: empty states, pairing wizard, permission-meaning tooltips, and a "first session" guided tour.
2.2 Notification and alert channels for operators are undefined#
- Has: In-app timeline, dashboards, alerts (
180.C.28.02). - Missing: Operator reachability — desktop notifications, email, Slack, SMS,
or mobile push for approval-required, host-offline, long-running completion,
and policy denials.
180.C.28.02is for ops dashboards, not the creative operator. - Follow-up: Add a notifications stage or items in
180.C.21: channel preferences per user, per event class, with snooze/mute rules and test delivery.
2.3 Keyboard, accessibility, and localization are partial#
- Has: Playwright + accessibility tests for Control Room states
(
180.C.21.09). - Missing: Explicit keyboard shortcuts for approve/deny/pause/takeover, command palette, screen-reader-friendly timeline semantics, high-contrast and reduced-motion modes, localization (strings, dates, numbers, RTL), international keyboard layout handling for desktop-fallback typing.
- Follow-up: Add substages: keyboard-shortcut map and conflict check;
i18n/l10n string extraction; RTL and reduced-motion themes; and a
keyboard-layout-aware
desktop.typecommand.
2.4 Stream scrubbing, annotation, and sharing#
- Has: Audit replay view (
180.C.21.07), replay export (180.C.28.04). - Missing: Frame-accurate scrubbing with keyframe index, in-timeline annotations by the operator ("this is where the agent went wrong"), named bookmarks, clip/moment sharing with signed expiring links (for post-incident reviews), diff view for file/scene changes visualized on stream segments.
- Follow-up: Split
180.C.21.07into discrete items: keyframe index, annotation layer, bookmark persistence, expiring share link with audit.
2.5 Cost visibility to the operator is missing#
- Has: Spend and usage controls (
180.C.27.07). - Missing: Live, per-session cost display — tokens, gateway compute, TURN bandwidth, render/build minutes — in the Control Room while it happens, not just retroactively in budgets. Operators should be able to see "this session has cost $0.47 so far" before approving the next render.
- Follow-up: Add "Live cost panel" to
180.C.21with per-command cost attribution and session running total.
2.6 Multi-session awareness#
- Has: Single-session page (
180.C.21.02). - Missing: Multi-session overview — when an operator supervises three agents in parallel, they need a grid/mosaic view of mini-streams, a consolidated approval queue across sessions, and a "cross-session risk" ranking so they know which session to focus on.
- Follow-up: Add a multi-session dashboard item to
180.C.21or in180.C.30.03(multi-host rooms).
3. Ergonomics — Agent-Facing#
3.1 Capability discovery ergonomics#
- Has:
device.list, capability reports (180.C.06.04,180.C.14.03), capability memory (180.C.14.17). - Missing: A structured "what can I do right now, given current state"
query.
RemoteCapabilitylists what adapters exist; it does not tell the agent that Blender is currently modal in a popup, Unreal has 40 shaders compiling, or the project root is read-only today. Agents will burn tokens rediscovering state. - Follow-up: Add a
state.snapshotoragent.readinesscommand that returns current-state booleans and blockers alongside static capability.
3.2 Dry-run impact preview is only a single bullet#
- Has:
180.C.14.14— "dry-run plan and human-readable impact summary." - Missing: This one bullet carries enormous weight. It needs: schema for the plan object, integration with every risky namespace (not just Blender/ Unreal/browser but file/shell/desktop), an explicit cost/time estimate on top of impact, and rendering in Control Room so operators can compare "predicted vs actual" after execution.
- Follow-up: Split into
DryRunPlanschema, per-namespace planners, cost/ time estimator, Control Room predicted-vs-actual view.
3.3 No record/replay sandbox for agent authors#
- Has: Mock harness for gateway/host/adapters (
180.C.04). - Missing: A record-and-replay mode where an agent author can capture a real session and replay it offline to iterate on planning heuristics deterministically. The mock harness supports writing tests; it does not support "run my agent against a known scene/page without a real Blender or Chrome."
- Follow-up: Add a simulation/replay mode to the mock harness that loads real captured snapshots and replays adapter responses.
3.4 Agent error ergonomics#
- Has:
RemoteErrorCode,RemoteWarning(180.C.03.05), failure taxonomy (180.C.28.06). - Missing: Guidance on what the agent should try next embedded in the
error. A
permission.missingerror with "go ask the operator to grant Screen Recording and retry this command" is dramatically more useful than a bare code. Structuredremediationhints with a machine-parseable suggested-next-command would reduce wasted LLM turns significantly. - Follow-up: Extend
RemoteErrorCodewith structuredremediationfield: human text + suggested command template + whether auto-retry is safe.
4. Ergonomics — Developer and SDK#
4.1 Local dev quickstart isn't staged#
- Has: Gateway docs (
180.C.05.09), host docs (180.C.06.09), operator docs (180.C.29.02). - Missing: A single "5-minute from clone to round-trip" quickstart — docker-compose for gateway+postgres+redis, a fake host bound to localhost, an example MCP client, and a working Blender mock adapter. Each piece exists in a different stage's docs; new contributors have to reconstruct the spine.
- Follow-up: Add a
180.C.02.xor180.C.05.xitem for a single top-level quickstart referencing the individual package docs.
4.2 Adapter SDK for third parties#
- Has:
libs/bellona/remote-adaptersadapter interfaces (phase-180 introduction). - Missing: A public, documented adapter SDK with stable contract, hot- reload for dev, conformance test suite that a Maya/Houdini/Substance plugin author could target without forking Bellona. Without this, §1.2 can never be addressed cleanly.
- Follow-up: Add an "Adapter SDK and Conformance Suite" stage after
180.C.15(once Blender + Unreal have validated the adapter interface by example).
4.3 Command-author workflow is undefined#
- Has: Developer docs for adding commands, adapters, MCP tools, policy
rules, etc. (
180.C.29.03). - Missing: A scaffold or generator. Right now adding
foo.barmeans touching protocol, gateway, host, policy, audit, Control Room, SDK, CLI, docs — all by hand. A scaffolding tool that emits correct stubs across all of those is the difference between a 2-day task and a 2-hour task. - Follow-up: Add
tools/bellona/new-commandgenerator with conformance test as part of180.C.29.03.
4.4 Protocol evolution beyond version negotiation#
- Has: Protocol version negotiation and schema drift tests (
180.C.03.09,180.C.03.10). - Missing: Migration paths for stored data — device records, audit entries, session snapshots, approval decisions. What happens when the protocol adds a required field and a 6-month-old audit needs to be read?
- Follow-up: Add a stored-schema migration framework and tests to
180.C.08(audit) and180.C.07(device/session storage).
5. Security, Privacy, and Trust#
5.1 End-to-end encryption model isn't called out#
- Has: TLS transport (
180.C.25.03), device key rotation, pinning (180.C.27.01), project-root enforcement, redaction (180.C.27.03–.05). - Missing: Is the gateway trusted-to-see-plaintext or zero-knowledge? If an organization uses a shared SaaS gateway, can they insist stream/content be E2E-encrypted between agent and host such that the gateway only routes? This is a foundational decision, not a late hardening one.
- Follow-up: Add an ADR in
180.C.02deciding trusted-gateway vs E2E modes, and if E2E is adopted, corresponding key-exchange and audit integrity items.
5.2 Consent and recording law#
- Has: Privacy/legal review (
180.C.27.10). - Missing: Explicit consent flows for subjects captured incidentally (FaceTime windows, colleagues on camera via screen share, dictation overlays), watermarking of recorded streams, retention defaults per jurisdiction, right-to-erasure workflows against audit trails.
- Follow-up: Break
180.C.27.10into specific items: consent capture, watermarking, retention defaults, erasure-vs-immutable-audit reconciliation.
5.3 Supply-chain integrity of adapters#
- Has: SBOM, vulnerability scanning, malware scanning, tamper detection
(
180.C.26.10–.12). - Missing: Blender addons and Unreal plugins install from user-writable
paths. A malicious Python addon silently added to Blender's addons directory
would run inside the Remote Host's trust boundary.
180.C.26.12checks host binaries; it should also continuously verify Blender addon/Unreal plugin hashes across sessions, not only at install. - Follow-up: Add continuous integrity check for third-party-extended DCC
trust boundaries to
180.C.26and180.C.27.
5.4 Agent-to-agent trust and identity#
- Has: Device identity, revocation, organization controls (
180.C.27.01,180.C.27.06). - Missing: Agent identity is conflated with device or session. When multiple
agents (cloud, local, specialist) operate under one user (
180.C.14.16), which agent took which action? Audit attribution should distinguish "human operator U → orchestrator agent A → Blender-specialist agent B → command" at every timeline entry. - Follow-up: Formalize
RemoteActorwith operator/agent/delegation chain and thread it through audit and timeline.
6. Reliability, Operations, and Release#
6.1 Rollback semantics aren't uniform#
- Has: Blender undo checkpoints (
180.C.10.02,180.C.17.02), Unreal editor transactions (180.C.15.07), file snapshots (180.C.22.04), failed-mutation rollback in recovery flows (180.C.28.08). - Missing: Browser and desktop fallback have no rollback story. "Undo" for a
form submission is a different flow than an editor
Ctrl+Z, and there's no compensating-action framework. A singleSessionRollbackenvelope that describes what reversal means per namespace is absent. - Follow-up: Define a
RollbackStrategyenum (undo stack, snapshot restore, compensating action, manual remediation-only) per command class and enforce its presence inRemoteCommandEnvelope.
6.2 SLOs and error budgets aren't defined#
- Has: Performance budgets (
180.C.16.06,180.C.24.09), dashboards and alerts (180.C.28.01–.02). - Missing: Explicit SLO targets (command acknowledgement, stream start, approval round-trip, audit write) and error-budget policy that gates release. Without SLOs, alerts become noise.
- Follow-up: Add SLO definition and error-budget policy to
180.C.16or180.C.28, with automated release-gate check in180.C.29.
6.3 Release gate scope#
- Has: Release gate item
180.C.16.09lists the pre-stable checklist. - Missing: It doesn't cover Unreal production (only Unreal MVP), browser
production, desktop fallback hardening, macOS packaging, security completion,
or fleet. The
180.C.29.08/.09/.10final verification is more comprehensive but duplicates instead of superseding. - Follow-up: Align
180.C.16.09and180.C.29.08–.10— either the earlier gate is for "alpha" and clearly labeled, or it should point to the later one as the authoritative gate.
6.4 Migration from existing bridges#
- Has: Audit of existing
bridge-blender,bridge-unreal,blender- agent,bridge-core(180.C.02.01–.04). - Missing: A deprecation/coexistence plan. What happens to consumers of the old bridges while the new Remote Host is rolled out? Is there a translation shim, a hard cutover, or parallel operation? Currently implicit.
- Follow-up: Add a coexistence/deprecation substage after
180.C.23(Unreal production) describing shim, cutover date, and removal gate.
7. Testing#
7.1 Fuzzing and adversarial schema tests#
- Has: Extensive unit, integration, schema, contract, Playwright, and security tests across stages.
- Missing: Fuzz testing of
RemoteCommandEnvelopeagainst malformed inputs, oversized payloads, Unicode edge cases, and schema-downgrade attacks. Specifically called out because180.C.27.09focuses on prompt injection but not protocol-level fuzz. - Follow-up: Add fuzzing to
180.C.04(contract tests) and180.C.27.09(security tests).
7.2 Soak, load, and multi-day tests#
- Has: Network impairment (
180.C.16.04,180.C.25.07), chaos (180.C.28.09), performance budgets. - Missing: Multi-day host uptime (sleep/wake cycles, LaunchAgent crash loops, slow memory leaks), gateway load tests (N hosts, M agents), audit store growth under sustained load. Absent from any stage.
- Follow-up: Add a reliability/soak substage to
180.C.25or180.C.28.
7.3 Usability testing#
- Has: Accessibility tests (
180.C.21.09). - Missing: Human usability evaluation of the approval flow, takeover flow, and multi-session supervision. "Can a new operator successfully approve the right command under time pressure?" is untested.
- Follow-up: Add user-research milestone to
180.C.21(MVP) and180.C.29(pre-release).
8. Integration and Ecosystem#
8.1 External event sinks#
- Has: Internal audit, timeline, metrics.
- Missing: Outbound webhooks or event bus for Slack/Discord/email, ticketing (Linear/Jira), and incident systems (PagerDuty). Operators expect approval notifications and failure digests in their existing channels, not a separate Control Room.
- Follow-up: Add a webhooks/event-sink subsystem to
180.C.27or180.C.28.
8.2 Production tracking integration#
- Has: Cross-app creative flows (
180.C.22.06–.09). - Missing: Integration with production tracking (Autodesk Flow/Shotgun, ftrack, Kitsu). Studios will want agent actions reflected as task status updates automatically.
- Follow-up: Add optional production-tracking adapter to
180.C.22or fleet stage.
8.3 MCP composition with other servers#
- Has: MCP gateway (
180.C.14), tool-selection policy (180.C.14.10). - Missing: How Bellona MCP composes with other MCP servers (Isis, Yemaya, third-party). Agents in practice talk to multiple MCP servers; tool-name collisions, capability conflicts, and transport multiplexing are not addressed.
- Follow-up: Add an MCP composition substage to
180.C.14covering namespacing, discovery, and priority conflicts.
9. Structural / Checklist Meta#
9.1 Stage-size outliers#
180.C.14(MCP/Cloud-Agent) has 20 items;180.C.26has 14. Every other stage is ~10. Agents process "one stage" as one cognitive unit; oversized stages invite shortcut-taking, whichCLAUDE.mdalready flags as a recurring failure mode.- Follow-up: Split
180.C.14into "MCP Gateway MVP" and "Cloud-Agent Operations / Agent Policy." Split180.C.26into "macOS Host App" and "Signing, Updates, SBOM." - Phase 180 disposition:
180.C.14.26records the Stage 14 split as a future planning rule without renumbering the executable checklist:.01-.10are MCP Gateway MVP and.11-.25are Cloud-Agent Operations and Policy. The180.C.26split remains open for180.C.26.17.
9.2 Cross-cutting concerns have no home stage#
- Has: i18n, a11y, keyboard shortcuts, notifications, cost visibility, theming, localization — mentioned at most in passing.
- Missing: These concerns need to be staged alongside the features that
introduce them, not left to "Control Room Production Experience" to retrofit.
A "Cross-cutting UX Foundations" stage before
180.C.21would catch them early. - Follow-up: Add a cross-cutting UX stage or interleave the concerns as substages where they first become observable.
9.3 Hardware evidence budget#
- Has: Hardware blocker rule (
180.C.01.04), hardware smoke tests sprinkled across180.C.09–180.C.24. - Missing: No explicit inventory — which MacBooks, which Blender versions, which Unreal versions, which Chrome channels — are required for sign-off. Without this, "hardware evidence" becomes unverifiable.
- Follow-up: Add a hardware-matrix item to
180.C.02(alongside the compatibility matrix) listing required physical/virtual test rigs with OS/app versions.
9.4 "MVP" vs "Production" boundaries#
- Has: Stage titles distinguish MVP (
180.C.09,.10,.11,.12,.13,.14,.15) from Production (180.C.17,.19,.21,.23,.24). - Missing: No single definition of what MVP ships with, what demo scenarios
prove MVP-complete, or what the release artifact for MVP is.
180.C.16is called "Production Hardening" but precedes the production-coverage stages. - Follow-up: Rename
180.C.16to "Alpha Hardening and MVP Release Gate" and add a list of MVP demo scenarios as sign-off criteria.
9.5 Unreal sequencing relative to phase title#
- The phase title gives Blender and Unreal equal billing, but Unreal MVP is
180.C.15(after Blender+browser+desktop+MCP) and production coverage is180.C.23–.24. If Unreal parity is a real goal, either accept the delay explicitly in the phase header or interleave Unreal MVP earlier. - Follow-up: Add a note to the phase header setting Unreal expectations, or move Unreal MVP earlier.
10. Product / Go-to-Market#
The checklist is an engineering plan. These items sit outside engineering but block the system from being used by anyone other than Oshun itself.
- Pricing/metering model — what usage is charged (seats, sessions, compute,
bandwidth, render minutes)?
180.C.27.07implements controls but not a model. - Customer segmentation — solo creator vs small studio vs enterprise studio
vs education.
180.C.27.11references templates but not tiers. - Success metrics — activation (first session), retention (weekly sessions), agent task completion rate, approval latency, incident rate. None currently tracked.
- Free vs paid feature gating — which MCP tools are open, which require enterprise plan.
- Follow-up: Product workstream parallel to
180.C.27–180.C.29, or explicitly out of scope with a note.
Summary of Top Ten Gaps (Priority Order)#
- Operator notifications and reachability (§2.2) — approvals will bottleneck without out-of-app notification.
- Dry-run/impact preview depth (§3.2) — one bullet carrying enormous weight; should be its own substage.
- Rollback semantics uniformity (§6.1) — browser/desktop have no rollback, and that's where risky actions live.
- Agent error remediation hints (§3.4) — cheapest way to cut LLM cost and improve agent reliability.
- E2E encryption decision (§5.1) — needs to be an early ADR, not a late hardening item.
- Adapter SDK + conformance suite (§4.2) — blocks Tier-2 DCC support and any third-party integration.
- Windows/Linux host scope decision (§1.1) — either commit to it or explicitly scope it out, don't leave ambiguous.
- Live cost visibility in Control Room (§2.5) — operators can't make good approve/deny decisions without it.
- Multi-session supervision UI (§2.6) — the phase talks about multi-host
fleets (
180.C.30) but not multi-session operator flow. - Structural split of oversized stages (§9.1) — reduces risk of batch-marking shortcuts.