# Eve SOTA future-workbench seam totality gate

- **Task:** 1.9
- **Evaluated:** 2026-09-08
- **Decision:** required-workbench-completion-gates-fail-closed
- **Record digest:**
  `5eb808b6ae7c6916106d8cc3c18711cab3863692f4453dda3b76beb5895c031c`

## Exit-gate rule

Every future workbench phase must end with **required Eve reads and writes
admitted with source and behavior evidence, or an exact task-0.8 explicit
non-goal proves zero operations; a named defer preserves ownership but never
passes completion**. The gate discovers post-M workbench phases from the
canonical ledger; a new phase without an explicit policy, ratified task-0.8
binding, and terminal exit task fails generation.

| Phase | Domain  | Task-0.8 workflow       | Terminal gate | Route/state candidates | Source files | Completion                     | Accountable owner                                          |
| ----- | ------- | ----------------------- | ------------- | ---------------------: | -----------: | ------------------------------ | ---------------------------------------------------------- |
| Y     | yemaya  | wf-6be56b986038c275e65f | Y9.19         |                    529 |         3302 | false (deferred-required-seam) | Yemaya workbench owner and Eve platform integration owner  |
| V     | veritas | wf-a2fdf39b610659ae414f | V9.25         |                    178 |         1284 | false (deferred-required-seam) | Veritas workbench owner and Eve platform integration owner |
| E     | euterpe | wf-82fbadf80500a88d0e1c | E9.22         |                     34 |          993 | false (deferred-required-seam) | Euterpe workbench owner and Eve platform integration owner |
| A     | aja     | wf-754e9a3efee4f3775706 | A8.20         |                    174 |          600 | false (deferred-required-seam) | Aja workbench owner and Eve platform integration owner     |
| B     | bellona | wf-8a841ecd53ab847c41cc | B9.19         |                    203 |         1053 | false (deferred-required-seam) | Bellona workbench owner and Eve platform integration owner |

## Why this is fail-closed

- The terminal task must be the final top-level checklist item in its phase and
  contain the canonical marker and clause.
- Every phase is bound to an exact ratified task-0.8 required workflow and its
  complete requirement-ID set.
- Required workbench completion needs both admitted read and write operation
  classes with byte-pinned source and behavior proof.
- A defer retains owner and unblock metadata but always returns a failing
  completion result.
- A zero-operation boundary passes only with an exact task-0.8 explicit-non-goal
  workflow and requirement; missing implementation is not a non-goal.
- The candidate ratchet covers every discovered BFF/bridge operation source plus
  every source file carrying a state signal.
- The code-envelope ratchet covers all tracked production source in each domain,
  so even a novel persistence mechanism changes the reviewed digest.
- The real CLI evaluates missing-read, missing-write, deferred-required,
  source-backed non-goal, and admitted-operation cases with retained exit-code
  expectations.

## Gate CLI contract cases

| Case                         | Obligation              | Expected exit | Completion | Reasons                                                                                          |
| ---------------------------- | ----------------------- | ------------: | ---------- | ------------------------------------------------------------------------------------------------ |
| missing-required-read        | required-seam           |             1 | false      | missing-required-read                                                                            |
| missing-required-write       | required-seam           |             1 | false      | missing-required-write                                                                           |
| deferred-required-seam       | required-seam           |             1 | false      | missing-required-read, missing-required-write, deferred-required-seam, required-seam-unavailable |
| valid-source-backed-non-goal | zero-operation-boundary |             0 | true       | none                                                                                             |
| real-admitted-operations     | required-seam           |             0 | true       | none                                                                                             |

## Coverage

- Governed phases: 5
- Route/state candidates: 1118
- Missing policies: 0
- Missing exit gates: 0
- Unclassified candidates: 0
- Blocked required phases: 5
- Completion-satisfied phases: 0
- Gate contract cases: 5
- Contract totality: true

## Honest limits

- This gate closes task 1.9 only. It does not complete phases Y/V/E/A/B, admit a
  new Eve view or command for those phases, or close G4.
- Every governed phase is a task-0.8 required workflow and is currently
  unavailable; its named defer preserves accountable ownership but the recorded
  completion result is false.
- The positive admitted-operation control uses Tara read and write contracts
  that already exist in the repository to prove the gate can pass real source-
  and behavior-backed operations; it does not transfer Tara coverage to
  Y/V/E/A/B.
- The zero-operation control is limited to one exact task-0.8 explicit non-goal
  about avoiding a tenth content pipeline. Absence of implementation, a defer,
  or an invented verdict cannot substitute for that source binding.
- The code-envelope ratchet covers every tracked production TypeScript,
  JavaScript, Rust, and Prisma source under each domain root plus discovered
  BFF/bridge route files; generated binaries, untracked files, runtime-only
  routes, and shared stores with no domain route reference remain outside this
  static census.
- State candidates are conservative static signals and include in-memory or pure
  stores; a candidate is a demand for an explicit disposition, not proof that
  the state is durable or operator-visible.
- Behavior evidence is repository test-harness evidence, not a staging or
  production observation. Each future phase must replace its unavailable
  disposition with its own runtime evidence before exit.
