Eve library
ISIS v2 Cinematic Shot Sequence Workflow Templates and Presets
Guide
Revision 1
On this page
Generated: 2026-08-02T19:12:20.625Z Checklist: MXA-0476 (ISIS2-00674) Asset
Family: cinematic-shot-sequence Phase: Phase 4 | Milestone: M3 Launch
(2026-07-27 to 2026-10-30)
Objective#
Add canonical workflow templates and preset bundles for draft/final/hero
cinematic-shot-sequence production tiers with deterministic parameter ladders
and variant-specific control/continuity behavior for rapid ideation through
continuity-locked cinematic delivery.
Workflow Templates#
Tier
Template ID
Default Variant
Fallbacks
Quality Mode
draft
cinematic-shot-sequence-draft-template
baseline
image-conditioned
iteration
final
cinematic-shot-sequence-final-template
control-conditioned
image-conditioned, baseline
production
hero
cinematic-shot-sequence-hero-template
consistency-locked
control-conditioned
hero-signature
Preset Bundles#
Tier
Preset ID
Control Preset
Consistency Presets
Workflow Variant Bindings
draft
cinematic-shot-sequence-draft-preset
gameplay-asset-control
scene-continuity-lock
baseline, image-conditioned
final
cinematic-shot-sequence-final-preset
gameplay-asset-control
scene-continuity-lock, style-bible-lock
control-conditioned, image-conditioned
hero
cinematic-shot-sequence-hero-preset
cinematic-asset-control
cinematic-continuity-bundle, scene-continuity-lock
consistency-locked, control-conditioned
Tier Parameter Targets#
Tier
Width
Height
Steps
CFG Scale
Seed Policy
draft
1920
1080
28
6.2
fixed-default-with-optional-explicit-override
final
1920
1080
30
6
fixed-default-with-explicit-override
hero
1920
1080
32
6.1
fixed-default-and-lock-required
Tier Selection Policy#
Default tier: draft
Promotion path: draft -> final -> hero
Draft -> Final requirements:
shot staging and shot readability approved in review
control-map inputs (pose/depth/segmentation/canny/lineart) available or
explicitly waived
Final -> Hero requirements:
continuity profile locked and validated for blocking/camera/style dimensions
scene anchor, layout, and blocking references approved by creative direction
Acceptance Criteria#
Template catalog includes draft, final, and hero tiers with explicit variant
fallback logic.
Preset bundles map to available control and consistency preset inventories
with deterministic cinematic parameter targets.
Tier progression preserves output package contract and dependency manifest
compatibility requirements.
Hero tier requires continuity-profile-capable workflow path with scene anchor,
layout, and blocking lock support.
Traceability#
Checklist item: MXA-0476
Ticket key: ISIS2-00674
Source references:
docs/domains/isis/remediation-v2/ISIS_REMEDIATION_V2_TICKETS.json
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_REQUIREMENTS_BRIEF.json
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_OUTPUT_PACKAGE_CONTRACT.json
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_MODEL_NODE_DEPENDENCY_MANIFEST.json
libs/isis/job-envelope/src/job-envelope.ts
libs/isis/workflows/src/consistency/orchestration.ts
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_BASELINE_WORKFLOW_GRAPH.json
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_IMAGE_CONDITIONED_WORKFLOW_GRAPH.json
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_CONTROL_CONDITIONED_WORKFLOW_GRAPH.json
docs/domains/isis/remediation-v2/ISIS_V2_CINEMATIC_SHOT_SEQUENCE_CONSISTENCY_LOCKED_WORKFLOW_GRAPH.json
docs/domains/isis/remediation-v2/ISIS_V2_ACCEPTANCE_CRITERIA.md
ISIS_TODOS_2.md