Eve library

ISIS v2 Environment Matte Painting Cost Estimation and Budget Guardrails

Guide

Revision 1

On this page

Generated: 2026-02-28T11:00:12.265Z Checklist: MXA-0158 (ISIS2-00356) Asset Family: environment-matte-painting Phase: Phase 4 | Milestone: M3 Launch (2026-07-27 to 2026-10-30)

Objective#

Deliver deterministic per-run cost/runtime estimation and threshold-based budget guardrails for environment-matte-painting workflow execution, with enforcement and observability integrated into workflow run APIs and provider compatibility diagnostics.

Workflow Coverage#

Workflow Cost Utils Coverage Jobs Strategy Coverage Workflow Surface Coverage
environment-matte-painting-baseline yes yes no
environment-matte-painting-image-conditioned yes yes no
environment-matte-painting-control-conditioned yes yes yes
environment-matte-painting-consistency-locked yes yes yes

Guardrail Environment Keys#

Env Key Cost Utils Coverage Jobs Strategy Coverage
ISIS_ENVIRONMENT_MATTE_PAINTING_BUDGET_GUARDRAIL_ENABLED yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_BUDGET_SOFT_LIMIT_USD yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_BUDGET_HARD_LIMIT_USD yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_RUNTIME_SOFT_LIMIT_SECONDS yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_RUNTIME_HARD_LIMIT_SECONDS yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_BUDGET_RETRY_AFTER_SECONDS yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_COST_RATE_FLUX_USD_PER_SECOND yes yes
ISIS_ENVIRONMENT_MATTE_PAINTING_COST_RATE_CHARACTER_CONSISTENCY_USD_PER_SECOND yes yes

Verification Commands#

  • pnpm --filter @isis/generation-api exec vitest run src/routes/environment-matte-painting-budget-utils.spec.ts src/routes/workflows.spec.ts src/routes/jobs.spec.ts

Acceptance Criteria#

  • Environment matte painting workflow variants return deterministic estimated runtime/cost signals before dispatch.
  • Budget guardrail thresholds enforce hard-fail rejection when estimated runtime/cost envelopes exceed configured limits.
  • Workflow run responses and headers expose estimation and guardrail diagnostics for operator visibility and downstream tooling.
  • Provider compatibility diagnostics expose environment-matte-painting cost estimation profiles and budget guardrail policy metadata.

Traceability#

  • Checklist item: MXA-0158
  • Ticket key: ISIS2-00356
  • Enforcement route: /api/v1/workflows/:workflowId/run