# ISIS v2 Rollback and Change Freeze Policy

Date: 2026-02-23  
Scope: `M0` to `M3` phases defined in
`docs/domains/isis/remediation-v2/ISIS_V2_MILESTONES.md`

## Purpose

Define mandatory rollback triggers and change-freeze rules for each launch phase
to reduce blast radius and preserve release integrity.

## Global Rules

- Any triggered rollback condition pauses forward promotion immediately.
- Incident commander (SRE) and owning function must be assigned within 30
  minutes of trigger.
- Rollback target must be latest verified stable state for the affected
  component.
- Freeze windows block non-emergency changes unless exception approval is
  granted by Product + Platform + SRE.

## Rollback Triggers (Global)

Rollback is mandatory when any condition below occurs:

1. Contract integrity failure in production path (API/SDK mismatch causing
   failed critical flows).
2. Security regression with unresolved `critical` or `high` exploitability.
3. Sustained SLO breach for critical flow beyond threshold for 30 minutes.
4. Cost anomaly above approved threshold with no active mitigation.
5. Data integrity regression (orphaned outputs, broken lineage/provenance writes
   in critical path).

## Phase Policies

### M0 Foundation (2026-02-23 to 2026-04-03)

#### Freeze Policy

- Freeze starts 48 hours before M0 gate decision.
- Allowed during freeze:
  - blocker fixes for `critical` governance/contract issues,
  - documentation corrections for governance artifacts.
- Disallowed during freeze:
  - schema shape changes without emergency waiver,
  - non-critical refactors.

#### Rollback Criteria

- Ticket generation artifacts lose 1:1 checklist mapping.
- Severity/tagging/governance automation produces inconsistent output.
- Missing required sign-off/rubric/milestone/acceptance artifacts.

### M1 Expansion (2026-04-06 to 2026-05-29)

#### Freeze Policy

- Freeze starts 72 hours before M1 gate decision.
- Allowed during freeze:
  - runtime correctness fixes,
  - SRE-approved reliability patches.
- Disallowed during freeze:
  - net-new runtime features,
  - provider topology redesign.

#### Rollback Criteria

- Provider/job execution path failures exceed approved threshold.
- RunPod endpoint health degrades across critical families.
- Cost attribution correctness falls below acceptance threshold.

### M2 Certification (2026-06-01 to 2026-07-24)

#### Freeze Policy

- Freeze starts 5 days before M2 gate decision.
- Allowed during freeze:
  - test fixes with no behavior change,
  - critical accessibility/security remediations.
- Disallowed during freeze:
  - UX redesign scope expansions,
  - non-critical dependency upgrades.

#### Rollback Criteria

- Certification suite fails for previously passing critical flows.
- UX critical journeys regress.
- Security or compliance checks fail for critical scenarios.

### M3 Launch (2026-07-27 to 2026-10-30)

#### Freeze Policy

- Progressive freeze:
  - soft freeze at start of M3,
  - hard freeze 7 days before launch close decision.
- Allowed during hard freeze:
  - approved launch blockers only.
- Disallowed during hard freeze:
  - new matrix scope additions,
  - architecture-level rework.

#### Rollback Criteria

- Launch gate sign-off is incomplete or revoked by any mandatory function.
- Matrix certification evidence is incomplete or inconsistent.
- Any production critical incident attributable to unresolved launch-scope
  changes.

## Exception Process

Freeze exceptions require:

1. written risk statement,
2. explicit rollback plan,
3. approving signatures from Product + Platform + SRE.

## Traceability

Primary checklist item:

- `WS00-008`

Related:

- `WS00-003`
- `WS00-004`
- `WS00-007`