Scope: Cross-functional approval model for ISIS_TODOS_2.md remediation execution and release decisions.

Purpose#

Define mandatory approvers, evidence requirements, and blocking criteria for the v2 remediation program so completion decisions are consistent and auditable.

Required Functions#

  • Platform
  • Creative Tech
  • Frontend
  • SRE
  • Security
  • Product

Approval Gates#

Gate Description Required Sign-Offs
G0 Program governance setup complete (WS00-*) Product, Platform
G1 Contract and taxonomy foundations complete (WS01-WS03) Platform, Creative Tech, Security
G2 Runtime and RunPod capability expansion complete (WS04-WS10) Platform, Creative Tech, SRE, Security
G3 UX and operational readiness complete (WS11-WS18) Frontend, Product, SRE, Security
G4 Matrix-scale certification closure (MXA-MXD) Creative Tech, Frontend, Platform, Product

No gate is considered complete unless every required function signs off.

Function Ownership and Criteria#

Function Primary Owner Delegates Allowed Mandatory Evidence Block Conditions
Platform @oshun/platform @oshun/isis-team tech lead Contract parity checks, observability health, queue/provider readiness Missing telemetry, unresolved contract drift, failed reliability gates
Creative Tech @oshun/creative-tech domain leads for asset families Workflow coverage matrix, control/consistency certification, quality benchmark results Uncovered asset/control classes, failed consistency thresholds
Frontend @oshun/isis-web design system lead UX parity tests, accessibility checks, creator/reviewer workflow validation Broken UX journeys, inaccessible critical interactions
SRE @oshun/devops on-call lead RunPod endpoint health, rollout/rollback readiness, SLO reports Failed canary/ramp criteria, missing rollback readiness
Security @oshun/security security reviewer on duty Authz and tenant isolation checks, callback signing verification, policy conformance Critical/high unresolved findings, tenant boundary regression
Product @oshun/product product ops lead Scope acceptance, user-priority alignment, release readiness summary Scope misses high-priority features, unresolved acceptance criteria

Sign-Off Workflow#

  1. Delivery owner prepares an evidence bundle for the target gate.
  2. Evidence bundle is posted with references to tickets and artifacts.
  3. Each required function records one of: APPROVED, APPROVED_WITH_CONDITIONS, REJECTED.
  4. APPROVED_WITH_CONDITIONS requires deadline-bound follow-up tickets.
  5. Any REJECTED status blocks gate completion.
  6. Product records final gate disposition after all mandatory approvals.

Evidence Bundle Minimum Contents#

  • Gate target and included checklist IDs.
  • Summary of completed tickets and remaining risks.
  • Test results (contract, integration, E2E, reliability, security).
  • Operational data (RunPod metrics, queue health, cost/compliance signals).
  • UX validation artifacts for relevant creator/reviewer/operator flows.
  • Exception list (if any) with owner and remediation deadlines.

Decision Record Template#

md
### ISIS v2 Gate Sign-Off

- Gate:
- Date:
- Scope (ticket ranges):
- Evidence bundle:
- Platform:
- Creative Tech:
- Frontend:
- SRE:
- Security:
- Product:
- Result: APPROVED | APPROVED_WITH_CONDITIONS | REJECTED
- Conditions (if any):
- Follow-up tickets:

Traceability#

Primary checklist item:

  • WS00-003

Related governance tasks:

  • WS00-004
  • WS00-005
  • WS00-006
  • WS00-007