# OPS-006 Certification: Post-Incident Review Template for Generation Failures and Cost Overruns

Date: 2026-02-22  
Checklist Item: `OPS-006`  
Ticket: `ISIS-0241`

## Scope

Operational governance coverage for post-incident learning and closure quality:

1. Standardized review template specific to Isis generation failure and
   cost-overrun scenarios.
2. Mandatory evidence, timeline, reliability metrics, and budget-impact
   sections.
3. On-call runbook linkage to enforce usage during incident closure workflows.

## Evidence Matrix

| Requirement                                                             | Evidence                                                                                                                                                                                                                        | Status |
| ----------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ------ |
| Isis-specific post-incident review template exists                      | `docs/domains/isis/remediation/ISIS_POST_INCIDENT_REVIEW_TEMPLATE.md` provides a dedicated template for generation reliability incidents and RunPod cost overruns.                                                              | Pass   |
| Template captures generation failure diagnostics                        | Same template includes submit/queue/provider/worker/storage failure-path breakdown, SLI/SLO impact matrix, alert effectiveness analysis, and root-cause workflow sections.                                                      | Pass   |
| Template captures cost overrun diagnostics                              | Same template includes dedicated cost-overrun analysis section (forecast vs actual, overrun drivers, guardrail transitions, control gaps, and recovered/avoided cost).                                                          | Pass   |
| Corrective/preventive action tracking is enforceable                    | Same template includes structured CAPA table with owner/due-date/ticket fields plus validation and rollout/rollback plan requirements for closure.                                                                              | Pass   |
| On-call playbook references template as required post-incident artifact | `docs/domains/isis/runbooks/runpod-oncall.md` now includes an explicit post-incident review requirement section and links the template in related docs to ensure SEV-1/SEV-2 and cost-overrun events follow consistent closure. | Pass   |

## Reproduction Commands

```bash
test -f docs/domains/isis/remediation/ISIS_POST_INCIDENT_REVIEW_TEMPLATE.md
rg -n "Post-Incident Review Requirement|ISIS_POST_INCIDENT_REVIEW_TEMPLATE.md" docs/domains/isis/runbooks/runpod-oncall.md
```
