Eve library

Eve supplemental-revision assignment · 2026-09-08

Guide

Revision 1

On this page

This receipt records a fail-closed bridge between the presentation center's primary source inventory and unchanged Markdown cited by a later, committed slide snapshot. It also records the first section-level assignment enabled by that bridge: the complete “Two planes” section of libs/oshun/product-graph/README.md to eve-cap-graph-planes in the eve-product-graph guide.

Revision boundary#

The primary inventory remains pinned to 1ceae52c7896a59ac74a4429d410f3218f0b91c6. The twelve Eve capability guides are intentionally pinned to 8c27a8d3350fe7484c18585b570f72a561090540. A newer slide cannot close a primary-inventory unit merely because it cites the same path.

Assignment files now retain their declared full source SHA during validation. For a non-primary revision, the coverage gate reads the exact committed Git blob and compares the hash of the complete file with the primary inventory's pinned file hash. The assignment also has to match the unit path and heading, the slide has to declare the assignment revision, and the existing unit, slide, citation, guide-membership, rationale and explanation checks still apply. A changed or missing file, working-tree substitute, wrong revision, wrong path, wrong heading or stale slide remains rejected. Workflow declaration units use their existing pointer/role contract and do not acquire a Markdown-heading requirement.

The review record shows that the product-graph README has SHA-256 9553bf8a8ad300335fc19d33d5cd6486c8b4c3cd3e0dbfea96e248f584a89212 at both revisions. No equivalence is inferred for the other supplemental sources.

Editorial review#

The complete 61-word source unit says that repository knowledge is compiled and read-only at runtime, while conversation-born intent lives in Postgres and reaches graph analysis only as an intent projection. Promotion occurs through a source change and artifact rebuild.

The dedicated slide teaches those same boundaries through a three-part visual, three notes and three questions. It further qualifies the assistant's serving runtime as a narrower manifest-checked composition than the complete compiled graph. This assignment does not cover projection setup, cross-plane query packs, implementation files, live database state, deployment behavior, comprehension, listening or product acceptance.

The generated teaching report moves from 41 reviewed / 103,285 unassigned to 42 reviewed / 103,284 unassigned, with 10,018 structural units unchanged and no invalid or stale assignments. The global completion gate still exits 1 and the backfill checkbox remains open.

Verification#

  • A complete pinned Docs Center recollection matches all 105 inventory shards: 9,262 authored sources, 319 generated pages and 3,505 entities.
  • Repository and workflow inventory checks pass. Their indexes changed only to retain the new shared collector hash and, in the workflow index, the resulting upstream repository-index hash; all 140,123 repository entries and all 3,718 workflow declaration units remain unchanged.
  • All 20 inventory tests and 20 workflow inventory tests pass, including byte-identical admission and changed/unattested/revision/path/heading rejection. All 255 presentation Python tests pass.
  • Builder freshness remains 578 slides from 347 cited sources. No presentation content, generated HTML/PDF, narration, catalog or coverage artifact changed.
  • Coverage freshness passes at 42 reviewed units; its intentionally strict global completion mode returns 1.
  • Task-scoped Ruff, Python compilation, Prettier, local links, diff checks and this receipt verifier pass.

The implementation baseline is 67b3ec573070d67153981a205b00b6644fe53045. No UI or delivered presentation artifact changed, so browser and visual review from the bound Eve delivery remain valid and were not rerun for this assignment/tooling package.