Generated on May 8, 2026. This folder is the uniform Oshun-local documentation home for the Brigid domain.
Executive Summary#
Brigid (Celtic goddess of the forge, smithcraft, fire, and transformation) is the industrial automation intelligence domain — the backbone of the entire Oshun ecosystem. Brigid encompasses 24 integrated business units spanning factory automation, custom machine building, industrial AI systems, process automation, energy solutions (solar + battery + grid), water and waste treatment, refrigeration and HVAC, weighing and calibration, technical training academy, maintenance-as-a-service, collaborative robotics, digital twin technology, warehouse robotics, industrial cybersecurity, turnkey factory design, packaging automation, agricultural mechanization, mining automation, oil and gas automation, supply chain optimization, plastics recycling and manufacturing, packaging materials production, welding consumables manufacturing, and industrial gases production. Every other operating company in the Oshun portfolio depends on Brigid's capabilities — Brigid provides the manufacturing equipment, energy systems, automation infrastructure, and industrial intelligence that powers the physical economy.
Documentation Contract#
Domain Profile#
- Domain slug:
brigid - Display name: Brigid
- Aliases: None
- TODO phase coverage:
59 - TODO phase titles:
Brigid - Industrial Automation Intelligence - Repository status: Repository implementation exists under apps/libs/services.
- Oshun integration status: No Oshun shell references discovered yet.
- Source confidence: Implementation-backed
Evidence Profile#
| Source | Status | Notes |
|---|---|---|
| Repository implementation | present | 30 app/lib/service entries discovered |
| Standalone domain docs | absent | 0 entries under docs/domains/brigid |
| TODO phase coverage | present | 1 mapped phase(s), 710 checklist items |
| Tests | absent | 0 matching test files discovered |
| Oshun integration | absent | 0 Oshun-local references discovered |
Capability Pillars#
| Capability Pillar | Primary Source | Status |
|---|---|---|
| Library Structure Setup | TODOS.md phase 59 | planned-or-partially-implemented |
| Database Schema Design | TODOS.md phase 59 | planned-or-partially-implemented |
| Infrastructure Services | TODOS.md phase 59 | planned-or-partially-implemented |
| Equipment & Asset Types | TODOS.md phase 59 | planned-or-partially-implemented |
| Maintenance & Calibration Types | TODOS.md phase 59 | planned-or-partially-implemented |
| Energy & Utility Types | TODOS.md phase 59 | planned-or-partially-implemented |
| Robotics & Digital Twin Types | TODOS.md phase 59 | planned-or-partially-implemented |
| Security & Training Types | TODOS.md phase 59 | planned-or-partially-implemented |
| Business & Financial Types | TODOS.md phase 59 | planned-or-partially-implemented |
| Shared Utilities & Validators | TODOS.md phase 59 | planned-or-partially-implemented |
| Production Line Design & Simulation | TODOS.md phase 59 | planned-or-partially-implemented |
| PLC Programming Frameworks | TODOS.md phase 59 | planned-or-partially-implemented |
| SCADA System Architecture | TODOS.md phase 59 | planned-or-partially-implemented |
| HMI Design & Control Systems | TODOS.md phase 59 | planned-or-partially-implemented |
| Industrial Communication & Networking | TODOS.md phase 59 | planned-or-partially-implemented |
| Motion Control & Pneumatics/Hydraulics | TODOS.md phase 59 | planned-or-partially-implemented |
| Safety Systems | TODOS.md phase 59 | planned-or-partially-implemented |
| Batch & Continuous Process Control | TODOS.md phase 59 | planned-or-partially-implemented |
| Custom Machine Design Workflow | TODOS.md phase 59 | planned-or-partially-implemented |
| Mechanical Design Integration | TODOS.md phase 59 | planned-or-partially-implemented |
| Electrical Design | TODOS.md phase 59 | planned-or-partially-implemented |
| BOM & Assembly Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Compliance & Documentation | TODOS.md phase 59 | planned-or-partially-implemented |
| Computer Vision for Quality Inspection | TODOS.md phase 59 | planned-or-partially-implemented |
| Predictive Maintenance AI | TODOS.md phase 59 | planned-or-partially-implemented |
| Process Optimization AI | TODOS.md phase 59 | planned-or-partially-implemented |
| Robotics & Logistics AI | TODOS.md phase 59 | planned-or-partially-implemented |
| Edge AI Infrastructure | TODOS.md phase 59 | planned-or-partially-implemented |
| Solar PV System Design | TODOS.md phase 59 | planned-or-partially-implemented |
| Battery Energy Storage System (BESS) Design | TODOS.md phase 59 | planned-or-partially-implemented |
| Grid & Hybrid System Configuration | TODOS.md phase 59 | planned-or-partially-implemented |
| Power Quality & Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Ghana Energy Specifics | TODOS.md phase 59 | planned-or-partially-implemented |
| Predictive & Condition-Based Maintenance | TODOS.md phase 59 | planned-or-partially-implemented |
| CMMS & Work Order Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Spare Parts & Inventory | TODOS.md phase 59 | planned-or-partially-implemented |
| Maintenance KPIs & Analytics | TODOS.md phase 59 | planned-or-partially-implemented |
| Remote Monitoring & IoT | TODOS.md phase 59 | planned-or-partially-implemented |
| Collaborative Robot Deployment | TODOS.md phase 59 | planned-or-partially-implemented |
| Robot Programming & Simulation | TODOS.md phase 59 | planned-or-partially-implemented |
| AGV & Warehouse Automation | TODOS.md phase 59 | planned-or-partially-implemented |
| Robot Safety & Human-Robot Interaction | TODOS.md phase 59 | planned-or-partially-implemented |
| Factory Digital Twin | TODOS.md phase 59 | planned-or-partially-implemented |
| Equipment Digital Twin | TODOS.md phase 59 | planned-or-partially-implemented |
| Process & Production Simulation | TODOS.md phase 59 | planned-or-partially-implemented |
| Virtual Commissioning & Training | TODOS.md phase 59 | planned-or-partially-implemented |
| OT Security Assessment | TODOS.md phase 59 | planned-or-partially-implemented |
| Network Security Design | TODOS.md phase 59 | planned-or-partially-implemented |
| Threat Detection & Response | TODOS.md phase 59 | planned-or-partially-implemented |
| Access Control & Patch Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Mining Process Automation | TODOS.md phase 59 | planned-or-partially-implemented |
| Fleet & Logistics Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Safety & Environmental Systems | TODOS.md phase 59 | planned-or-partially-implemented |
| Upstream Automation | TODOS.md phase 59 | planned-or-partially-implemented |
| Midstream & Pipeline Automation | TODOS.md phase 59 | planned-or-partially-implemented |
| Downstream & Processing | TODOS.md phase 59 | planned-or-partially-implemented |
| Safety & Compliance | TODOS.md phase 59 | planned-or-partially-implemented |
| Primary Packaging Automation | TODOS.md phase 59 | planned-or-partially-implemented |
| Secondary & Tertiary Packaging | TODOS.md phase 59 | planned-or-partially-implemented |
| Inspection & Quality Systems | TODOS.md phase 59 | planned-or-partially-implemented |
| Packaging Line Optimization | TODOS.md phase 59 | planned-or-partially-implemented |
| Packaging Materials Production | TODOS.md phase 59 | planned-or-partially-implemented |
| Irrigation & Water Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Post-Harvest Handling | TODOS.md phase 59 | planned-or-partially-implemented |
| Greenhouse & Controlled Environment | TODOS.md phase 59 | planned-or-partially-implemented |
| Livestock & Aquaculture | TODOS.md phase 59 | planned-or-partially-implemented |
| Water Treatment Plant Design & Control | TODOS.md phase 59 | planned-or-partially-implemented |
| Wastewater Treatment | TODOS.md phase 59 | planned-or-partially-implemented |
| Industrial Effluent & Compliance | TODOS.md phase 59 | planned-or-partially-implemented |
| Cold Room & Refrigeration Design | TODOS.md phase 59 | planned-or-partially-implemented |
| HVAC System Design | TODOS.md phase 59 | planned-or-partially-implemented |
| Pharmaceutical & Specialty Cold Storage | TODOS.md phase 59 | planned-or-partially-implemented |
| Energy Optimization & Compliance | TODOS.md phase 59 | planned-or-partially-implemented |
| Curriculum Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Competency Assessment & Certification | TODOS.md phase 59 | planned-or-partially-implemented |
| Learning Platform & Delivery | TODOS.md phase 59 | planned-or-partially-implemented |
| Welding Consumables Manufacturing | TODOS.md phase 59 | planned-or-partially-implemented |
| Industrial Gas Production | TODOS.md phase 59 | planned-or-partially-implemented |
| Plastics Recycling & Manufacturing | TODOS.md phase 59 | planned-or-partially-implemented |
| Market Analysis | TODOS.md phase 59 | planned-or-partially-implemented |
| Sector-Specific Demand Analysis | TODOS.md phase 59 | planned-or-partially-implemented |
| Business Development Intelligence | TODOS.md phase 59 | planned-or-partially-implemented |
| Revenue & Cost Models | TODOS.md phase 59 | planned-or-partially-implemented |
| Portfolio Financial Analysis | TODOS.md phase 59 | planned-or-partially-implemented |
| Pricing & Costing | TODOS.md phase 59 | planned-or-partially-implemented |
| Brigid x Asase (Agriculture & Food) | TODOS.md phase 59 | planned-or-partially-implemented |
| Brigid x Freya (Beauty, Fashion & Textiles) | TODOS.md phase 59 | planned-or-partially-implemented |
| Brigid x Cybele (Construction & Infrastructure) | TODOS.md phase 59 | planned-or-partially-implemented |
| Brigid x Saraswati (Technology & Electronics) | TODOS.md phase 59 | planned-or-partially-implemented |
| Brigid x Maat (Data & Analytics) | TODOS.md phase 59 | planned-or-partially-implemented |
| Cross-Domain API Contracts | TODOS.md phase 59 | planned-or-partially-implemented |
| apps/brigid/factory-os - Factory Operations Dashboard | TODOS.md phase 59 | planned-or-partially-implemented |
| apps/brigid/energy - Energy Management System | TODOS.md phase 59 | planned-or-partially-implemented |
| apps/brigid/maintenance - Maintenance Management | TODOS.md phase 59 | planned-or-partially-implemented |
| apps/brigid/training - Academy Learning Platform | TODOS.md phase 59 | planned-or-partially-implemented |
| apps/brigid/api - Backend API | TODOS.md phase 59 | planned-or-partially-implemented |
| Industry 5.0 Human-Centric Manufacturing | TODOS.md phase 59 | planned-or-partially-implemented |
| Edge AI for Real-Time Quality | TODOS.md phase 59 | planned-or-partially-implemented |
| 5G-Enabled Remote Operations | TODOS.md phase 59 | planned-or-partially-implemented |
| AR/VR for Maintenance & Training | TODOS.md phase 59 | planned-or-partially-implemented |
| Generative AI for Industrial Design | TODOS.md phase 59 | planned-or-partially-implemented |
| Reinforcement Learning for Process Optimization | TODOS.md phase 59 | planned-or-partially-implemented |
| Federated Learning Across Factories | TODOS.md phase 59 | planned-or-partially-implemented |
| Digital Thread & Quantum Computing | TODOS.md phase 59 | planned-or-partially-implemented |
| Weighing Systems | TODOS.md phase 59 | planned-or-partially-implemented |
| Calibration Management | TODOS.md phase 59 | planned-or-partially-implemented |
| Supply Chain Planning | TODOS.md phase 59 | planned-or-partially-implemented |
| Logistics & Procurement | TODOS.md phase 59 | planned-or-partially-implemented |
Coverage Snapshot#
- Code footprint entries: 30
- Standalone domain doc entries: 0
- OpenAPI/API doc entries: 0
- Test evidence files: 0
- Oshun-specific references: 0
Source Precedence#
- Actual repository implementation under
apps/,libs/,services/, andopenapi/ - Checklist-derived scope from
TODOS.md - Existing standalone domain docs under
docs/domains/brigid/ - No feature claims are introduced without one of the sources above