Eve library

OSHUN Studio Color System Journeys and Edge Cases

Spec

Revision 1

On this page

Status: Active
Owner: OSHUN Studio Product Design + Web Engineering
Last Updated: 2026-02-23
Related:

  • docs/adr/ADR-0016-oshun-studio-color-system-and-token-governance.md
  • docs/releases/v1/specs/studio-color-system-dependency-and-data-contract-map.md

Purpose#

Define primary journeys and edge-case behavior for Studio color-system and token governance.

This document is the execution artifact for OST-00027.

Personas#

  • Design System Lead
  • Accessibility Lead
  • Brand Director
  • Technical Director
  • Program Reviewer

Journey Principles#

  1. Semantic state colors must remain deterministic across all domains.
  2. Domain accents are contextual signals, not status overrides.
  3. Contrast validation is a release gate, not optional review.
  4. Every governance action preserves Studio context and audit traceability.

1. Primary Journeys#

J1. Color Bundle Draft and Publish#

Goal: Publish a new color token bundle to preview.

Entry: Studio -> Color System -> Token Pipeline

Steps:

  1. Clone current color bundle as draft.
  2. Apply token updates (semantic/status/domain accents).
  3. Run schema and semantic map compatibility checks.
  4. Publish to preview channel.
  5. Record telemetry/audit and rollback baseline.

Success State:

  • New immutable bundle version is published.
  • Preview surfaces hydrate with new color tokens.

J2. Contrast and Semantic Validation#

Goal: Validate contrast and semantic differentiation.

Entry: Studio -> Color System -> Validation

Steps:

  1. Select target bundle version.
  2. Run contrast checks for text/surface/status combinations.
  3. Run semantic differentiation checks for status states.
  4. Review violations and remediation guidance.
  5. Re-run until validation passes.

Success State:

  • Contrast validation report status is pass.

J3. Domain Color Parity Sync#

Goal: Synchronize color token usage across domain surfaces.

Entry: Studio -> Color System -> Domain Parity

Steps:

  1. Generate drift report for Yemaya/Isis/Hathor/Aja/Bellona.
  2. Apply canonical token mappings to drifted surfaces.
  3. Re-run parity checks.
  4. Confirm pass state.
  5. Attach parity report to release package.

Success State:

  • Domain parity status is pass with zero critical drift findings.

J4. Program Approval and Production Promotion#

Goal: Promote validated color bundle to production.

Entry: Review & Approvals

Steps:

  1. Open release package and review evidence.
  2. Verify policy and approver matrix.
  3. Approve/reject with rationale.
  4. Promote to production if approved.
  5. Confirm deployment and event completeness.

Success State:

  • Production release completes with signed approvals and audit evidence.

J5. Color Incident Rollback#

Goal: Recover from production color regression.

Entry: Observability alert or escalation.

Steps:

  1. Identify failing bundle and impacted surfaces.
  2. Roll back to last certified bundle.
  3. Verify state semantics and contrast restoration.
  4. Freeze problematic bundle.
  5. Publish incident root-cause report.

Success State:

  • Stable color system restored and incident evidence logged.

2. Critical Edge Cases#

E1. Incomplete Studio Context#

  • Trigger: missing program/project/workspace IDs.
  • Required behavior: block action and request context repair.

E2. Unauthorized Publish Attempt#

  • Trigger: role lacks permission to publish color bundle.
  • Required behavior: deny with reason, emit audit denial.

E3. Token Schema Incompatibility#

  • Trigger: invalid token structure.
  • Required behavior: fail fast with token-level diagnostics.

E4. Contrast Validation Failure#

  • Trigger: AA contrast checks fail.
  • Required behavior: block release and require remediation.

E5. Semantic Differentiation Collapse#

  • Trigger: warning/error/success colors become ambiguous.
  • Required behavior: block release and highlight conflicting mappings.

E6. Domain Accent Overreach#

  • Trigger: domain accents applied to critical semantic statuses.
  • Required behavior: reject mapping and enforce semantic priority.

E7. Persistent Domain Drift#

  • Trigger: parity mismatch remains after sync.
  • Required behavior: block release and provide domain-level diagnostics.

E8. Telemetry Sink Degradation#

  • Trigger: audit events fail to emit.
  • Required behavior: retry and mark degraded observability state.

E9. Approval Deadlock#

  • Trigger: approver conflict/unavailability.
  • Required behavior: delegated approval policy and SLA escalation.

E10. Missing Rollback Reference#

  • Trigger: release package lacks rollback bundle.
  • Required behavior: prevent production promotion.

3. Journey-to-Surface Mapping#

Journey Primary Surface Supporting Surfaces
J1 Color Bundle Draft and Publish Color System Observability
J2 Contrast and Semantic Validation Color System Governance
J3 Domain Color Parity Sync Color System Programs, Projects
J4 Program Approval and Production Promotion Review & Approvals Governance
J5 Color Incident Rollback Observability Color System, Governance

4. Instrumentation Requirements#

Required events:

  • color.journey.started
  • color.journey.step.completed
  • color.journey.blocked
  • color.journey.recovered
  • color.journey.completed

Required dimensions:

  • programId, projectId, workspaceId
  • journeyId, stepId, bundleVersion
  • actorRole, outcome, latencyMs, errorCode

5. Acceptance Criteria (OST-00027)#

OST-00027 is complete only when:

  1. At least five color-system journeys are documented.
  2. At least ten color-system edge cases are documented with deterministic behavior.
  3. Journey-to-surface mapping is explicit.
  4. Instrumentation requirements and dimensions are documented.