Status: Active
Owner: OSHUN Studio Product Design + Web Engineering
Last Updated: 2026-02-23
Related:
docs/adr/ADR-0016-oshun-studio-color-system-and-token-governance.mddocs/releases/v1/specs/studio-color-system-dependency-and-data-contract-map.md
Purpose#
Define primary journeys and edge-case behavior for Studio color-system and token governance.
This document is the execution artifact for OST-00027.
Personas#
- Design System Lead
- Accessibility Lead
- Brand Director
- Technical Director
- Program Reviewer
Journey Principles#
- Semantic state colors must remain deterministic across all domains.
- Domain accents are contextual signals, not status overrides.
- Contrast validation is a release gate, not optional review.
- Every governance action preserves Studio context and audit traceability.
1. Primary Journeys#
J1. Color Bundle Draft and Publish#
Goal: Publish a new color token bundle to preview.
Entry: Studio -> Color System -> Token Pipeline
Steps:
- Clone current color bundle as draft.
- Apply token updates (semantic/status/domain accents).
- Run schema and semantic map compatibility checks.
- Publish to preview channel.
- Record telemetry/audit and rollback baseline.
Success State:
- New immutable bundle version is published.
- Preview surfaces hydrate with new color tokens.
J2. Contrast and Semantic Validation#
Goal: Validate contrast and semantic differentiation.
Entry: Studio -> Color System -> Validation
Steps:
- Select target bundle version.
- Run contrast checks for text/surface/status combinations.
- Run semantic differentiation checks for status states.
- Review violations and remediation guidance.
- Re-run until validation passes.
Success State:
- Contrast validation report status is
pass.
J3. Domain Color Parity Sync#
Goal: Synchronize color token usage across domain surfaces.
Entry: Studio -> Color System -> Domain Parity
Steps:
- Generate drift report for Yemaya/Isis/Hathor/Aja/Bellona.
- Apply canonical token mappings to drifted surfaces.
- Re-run parity checks.
- Confirm pass state.
- Attach parity report to release package.
Success State:
- Domain parity status is
passwith zero critical drift findings.
J4. Program Approval and Production Promotion#
Goal: Promote validated color bundle to production.
Entry: Review & Approvals
Steps:
- Open release package and review evidence.
- Verify policy and approver matrix.
- Approve/reject with rationale.
- Promote to production if approved.
- Confirm deployment and event completeness.
Success State:
- Production release completes with signed approvals and audit evidence.
J5. Color Incident Rollback#
Goal: Recover from production color regression.
Entry: Observability alert or escalation.
Steps:
- Identify failing bundle and impacted surfaces.
- Roll back to last certified bundle.
- Verify state semantics and contrast restoration.
- Freeze problematic bundle.
- Publish incident root-cause report.
Success State:
- Stable color system restored and incident evidence logged.
2. Critical Edge Cases#
E1. Incomplete Studio Context#
- Trigger: missing program/project/workspace IDs.
- Required behavior: block action and request context repair.
E2. Unauthorized Publish Attempt#
- Trigger: role lacks permission to publish color bundle.
- Required behavior: deny with reason, emit audit denial.
E3. Token Schema Incompatibility#
- Trigger: invalid token structure.
- Required behavior: fail fast with token-level diagnostics.
E4. Contrast Validation Failure#
- Trigger: AA contrast checks fail.
- Required behavior: block release and require remediation.
E5. Semantic Differentiation Collapse#
- Trigger: warning/error/success colors become ambiguous.
- Required behavior: block release and highlight conflicting mappings.
E6. Domain Accent Overreach#
- Trigger: domain accents applied to critical semantic statuses.
- Required behavior: reject mapping and enforce semantic priority.
E7. Persistent Domain Drift#
- Trigger: parity mismatch remains after sync.
- Required behavior: block release and provide domain-level diagnostics.
E8. Telemetry Sink Degradation#
- Trigger: audit events fail to emit.
- Required behavior: retry and mark degraded observability state.
E9. Approval Deadlock#
- Trigger: approver conflict/unavailability.
- Required behavior: delegated approval policy and SLA escalation.
E10. Missing Rollback Reference#
- Trigger: release package lacks rollback bundle.
- Required behavior: prevent production promotion.
3. Journey-to-Surface Mapping#
| Journey | Primary Surface | Supporting Surfaces |
|---|---|---|
| J1 Color Bundle Draft and Publish | Color System | Observability |
| J2 Contrast and Semantic Validation | Color System | Governance |
| J3 Domain Color Parity Sync | Color System | Programs, Projects |
| J4 Program Approval and Production Promotion | Review & Approvals | Governance |
| J5 Color Incident Rollback | Observability | Color System, Governance |
4. Instrumentation Requirements#
Required events:
color.journey.startedcolor.journey.step.completedcolor.journey.blockedcolor.journey.recoveredcolor.journey.completed
Required dimensions:
programId,projectId,workspaceIdjourneyId,stepId,bundleVersionactorRole,outcome,latencyMs,errorCode
5. Acceptance Criteria (OST-00027)#
OST-00027 is complete only when:
- At least five color-system journeys are documented.
- At least ten color-system edge cases are documented with deterministic behavior.
- Journey-to-surface mapping is explicit.
- Instrumentation requirements and dimensions are documented.