# OSHUN Studio Complex Interaction Patterns Journeys and Edge Cases

Status: Active  
Owner: OSHUN Studio Product Design + Web Engineering  
Last Updated: 2026-02-23  
Related:

- `docs/adr/ADR-0019-oshun-studio-complex-interaction-patterns-and-state-orchestration.md`
- `docs/releases/v1/specs/studio-complex-interaction-patterns-dependency-and-data-contract-map.md`

## Purpose

Define primary journeys and edge-case behavior for Studio complex interaction
pattern governance.

This document is the execution artifact for `OST-00051`.

## Personas

- Design System Lead
- Workflow Architect
- Accessibility Lead
- Technical Director
- Program Reviewer

## Journey Principles

1. Complex workflows must expose deterministic state transitions.
2. Recovery behavior (retry/reset/rollback) must always be available.
3. Parallel execution status must remain transparent and actionable.
4. Accessibility semantics must survive all async transitions.

## 1. Primary Journeys

### J1. Orchestration Bundle Draft and Publish

**Goal**: Publish a new interaction-orchestration bundle to preview.

**Entry**: `Studio -> Complex Interaction Patterns -> Bundle Pipeline`

**Steps**:

1. Clone current orchestration bundle.
2. Update workflow steps, transition rules, and timeout settings.
3. Run schema and transition-integrity checks.
4. Publish bundle to preview.
5. Record telemetry/audit evidence and rollback baseline.

**Success State**:

- Immutable orchestration bundle is published for preview.

### J2. State Transition and Recovery Validation

**Goal**: Validate transition determinism and recovery semantics.

**Entry**: `Studio -> Complex Interaction Patterns -> Validation`

**Steps**:

1. Select bundle version and target workflow set.
2. Run transition determinism checks.
3. Run retry/reset/rollback path checks.
4. Inspect violations and remediation guidance.
5. Re-run until validation pass.

**Success State**:

- Validation report status is `pass`.

### J3. Parallel Execution and Timeout Certification

**Goal**: Certify parallel task behavior and timeout/cancel handling.

**Entry**: `Studio -> Complex Interaction Patterns -> Concurrency`

**Steps**:

1. Run parallel execution simulation.
2. Inspect aggregate and per-task outcomes.
3. Trigger timeout and cancel scenarios.
4. Validate deterministic resolution behavior.
5. Attach concurrency report to release package.

**Success State**:

- Concurrency report status is `pass`.

### J4. Domain Interaction Parity Sync

**Goal**: Synchronize complex interaction behavior across domains.

**Entry**: `Studio -> Complex Interaction Patterns -> Domain Parity`

**Steps**:

1. Generate drift report by domain and workflow.
2. Apply canonical orchestration bundle references.
3. Re-run parity checks.
4. Confirm zero critical drift.
5. Attach parity report to release evidence.

**Success State**:

- Domain parity status is `pass` across all target domains.

### J5. Production Promotion and Incident Rollback

**Goal**: Promote validated bundle and recover quickly from production issues.

**Entry**: `Review & Approvals` or `Observability` alert.

**Steps**:

1. Review validation + concurrency + parity evidence.
2. Approve/reject promotion based on policy and evidence.
3. Promote approved bundle to production.
4. If regression occurs, execute rollback to certified version.
5. Publish incident postmortem and mitigation actions.

**Success State**:

- Either stable promotion completes or rollback restores stable behavior.

## 2. Critical Edge Cases

### E1. Incomplete Context

- Trigger: missing program/project/workspace identifiers.
- Required behavior: block action and request context repair.

### E2. Unauthorized Publish Attempt

- Trigger: role lacks publish permission.
- Required behavior: deny with explicit policy reason and audit event.

### E3. Invalid State Transition Definition

- Trigger: workflow step transitions are cyclic/illegal.
- Required behavior: fail validation with transition-path diagnostics.

### E4. Missing Recovery Action

- Trigger: flow has no retry/reset/rollback support.
- Required behavior: block release until recovery contract is complete.

### E5. Parallel Task Deadlock

- Trigger: one or more tasks remain unresolved past timeout threshold.
- Required behavior: fail execution, mark timed-out tasks, surface remediation.

### E6. Cancellation Semantics Drift

- Trigger: cancel action leaves workflow in inconsistent state.
- Required behavior: block promotion and require deterministic cancel handler.

### E7. Accessibility Focus Loss During Async Transition

- Trigger: focus is lost after pending-to-error or pending-to-success state.
- Required behavior: fail accessibility checks with focus-path diagnostics.

### E8. Persistent Domain Parity Drift

- Trigger: parity mismatch remains after sync.
- Required behavior: block release and emit domain/workflow diagnostics.

### E9. Telemetry/Audit Sink Degradation

- Trigger: telemetry or audit events fail to emit.
- Required behavior: retry, expose degraded observability, reconcile buffered
  events.

### E10. Missing Rollback Artifact

- Trigger: release package lacks rollback reference.
- Required behavior: block production promotion.

## 3. Journey-to-Surface Mapping

| Journey                                         | Primary Surface              | Supporting Surfaces       |
| ----------------------------------------------- | ---------------------------- | ------------------------- |
| J1 Orchestration Bundle Draft and Publish       | Complex Interaction Patterns | Observability             |
| J2 State Transition and Recovery Validation     | Complex Interaction Patterns | Governance                |
| J3 Parallel Execution and Timeout Certification | Complex Interaction Patterns | Observability             |
| J4 Domain Interaction Parity Sync               | Complex Interaction Patterns | Programs, Projects        |
| J5 Production Promotion and Incident Rollback   | Review & Approvals           | Observability, Governance |

## 4. Instrumentation Requirements

Required events:

- `interaction.journey.started`
- `interaction.journey.step.completed`
- `interaction.journey.blocked`
- `interaction.journey.recovered`
- `interaction.journey.completed`

Required dimensions:

- `programId`, `projectId`, `workspaceId`
- `journeyId`, `stepId`, `bundleVersion`
- `actorRole`, `outcome`, `latencyMs`, `errorCode`

## 5. Acceptance Criteria (OST-00051)

`OST-00051` is complete only when:

1. At least five complex-interaction journeys are documented.
2. At least ten complex-interaction edge cases are documented with deterministic
   behavior.
3. Journey-to-surface mapping is explicit.
4. Instrumentation requirements and dimensions are documented.
