Status: Active
Owner: OSHUN Studio Architecture + OSHUN Web + OSHUN BFF
Last Updated: 2026-02-23
Related:
docs/adr/ADR-0022-oshun-studio-cross-domain-entity-model.mddocs/releases/v1/specs/studio-cross-domain-entity-model-dependency-and-data-contract-map.md
Purpose#
Define primary journeys and deterministic edge-case behavior for cross-domain entity-model governance.
This document is the execution artifact for OST-00075.
Personas#
- Program Operator
- Domain Integrator
- Data Steward
- Security Reviewer
- Reliability Engineer
Journey Principles#
- Entity identity must remain stable and immutable once published.
- Entity resolution must map deterministically to routes/actions.
- Cross-domain relations must preserve lineage and traceability.
- Compatibility changes must be explicit, versioned, and recoverable.
1. Primary Journeys#
J1. Canonical Entity Envelope Publication#
Goal: Publish a new canonical entity-model schema bundle.
Entry: Studio -> Cross-Domain Entity Model -> Schema Pipeline
Steps:
- Draft entity envelope updates.
- Validate required fields and identity constraints.
- Validate extension namespace and version compliance.
- Publish schema bundle to preview channel.
- Attach rollback reference and audit evidence.
Success State:
- New entity envelope schema is published and validated.
J2. Cross-Domain Entity Resolution Validation#
Goal: Validate entity -> route/action mappings across domains.
Entry: Studio -> Cross-Domain Entity Model -> Resolution Validation
Steps:
- Select target entity types and domains.
- Run route/action mapping checks.
- Validate required context and fallback behavior.
- Remediate mapping failures.
- Re-run until pass.
Success State:
- Resolution validation passes with deterministic route/action outcomes.
J3. Entity Relation Graph Sync#
Goal: Synchronize cross-domain entity relation graph consistency.
Entry: Studio -> Cross-Domain Entity Model -> Relation Graph
Steps:
- Generate relation integrity report.
- Resolve orphaned or cyclic invalid relations.
- Re-sync canonical relation graph.
- Validate lineage trace continuity.
- Attach relation sync evidence.
Success State:
- Relation graph integrity passes for all governed domains.
J4. Compatibility and Migration Approval#
Goal: Approve schema changes with compatibility and migration checks.
Entry: Review & Approvals
Steps:
- Review compatibility matrix and breaking changes.
- Verify migration strategy and rollback version.
- Validate policy and approver requirements.
- Approve/reject with rationale.
- Promote to production if approved.
Success State:
- Approved entity schema release is promoted with complete evidence.
J5. Entity Model Incident Rollback#
Goal: Recover from production entity-model regression.
Entry: Observability alert or user escalation
Steps:
- Identify failing schema version and impacted entity types.
- Roll back to last certified schema bundle.
- Validate entity resolution and lineage recovery.
- Freeze problematic schema release.
- Publish incident analysis and mitigation actions.
Success State:
- Stable entity behavior is restored with traceable incident evidence.
2. Critical Edge Cases#
E1. Duplicate Entity ID Collision#
- Trigger: new entity envelope reuses existing
entityId. - Required behavior: fail validation and block publish.
E2. Missing Required Envelope Fields#
- Trigger: entity payload missing required canonical fields.
- Required behavior: reject payload with field-level diagnostics.
E3. Invalid Domain Attribution#
- Trigger: entity references unknown or mismatched domain.
- Required behavior: fail validation and require authoritative domain mapping.
E4. Broken Route Resolution#
- Trigger: entity type has no valid route/action contract.
- Required behavior: block release and provide resolution diagnostics.
E5. Relation Graph Cycle Violation#
- Trigger: relation sync introduces prohibited cycles.
- Required behavior: fail sync and identify violating edges.
E6. Orphaned Relation Targets#
- Trigger: relation target entity does not exist.
- Required behavior: quarantine relation and block promotion.
E7. Compatibility Regression#
- Trigger: schema change breaks backward/forward compatibility policy.
- Required behavior: block release and require version/migration remediation.
E8. Telemetry/Audit Emission Failure#
- Trigger: entity lifecycle events fail to emit.
- Required behavior: retry, expose degraded observability, reconcile buffered events.
E9. Unauthorized Entity Model Mutation#
- Trigger: actor lacks permission for schema/relation changes.
- Required behavior: deny action, emit policy audit event.
E10. Missing Rollback Version#
- Trigger: release package lacks rollback schema reference.
- Required behavior: block production promotion.
3. Journey-to-Surface Mapping#
| Journey | Primary Surface | Supporting Surfaces |
|---|---|---|
| J1 Canonical Entity Envelope Publication | Cross-Domain Entity Model | Governance |
| J2 Cross-Domain Entity Resolution Validation | Cross-Domain Entity Model | Navigation/Commands |
| J3 Entity Relation Graph Sync | Cross-Domain Entity Model | Observability |
| J4 Compatibility and Migration Approval | Review & Approvals | Governance |
| J5 Entity Model Incident Rollback | Observability | Cross-Domain Entity Model |
4. Instrumentation Requirements#
Required events:
entity_model.journey.startedentity_model.journey.step.completedentity_model.journey.blockedentity_model.journey.recoveredentity_model.journey.completed
Required dimensions:
programId,projectId,workspaceIdjourneyId,stepId,entityType,schemaVersionactorRole,outcome,latencyMs,errorCode
5. Acceptance Criteria (OST-00075)#
OST-00075 is complete only when:
- At least five cross-domain entity journeys are documented.
- At least ten deterministic edge cases are documented.
- Journey-to-surface mapping is explicit.
- Instrumentation requirements and dimensions are documented.