Eve library

OSHUN Studio Cross-Domain Entity Model Journeys and Edge Cases

Spec

Revision 1

On this page

Status: Active
Owner: OSHUN Studio Architecture + OSHUN Web + OSHUN BFF
Last Updated: 2026-02-23
Related:

  • docs/adr/ADR-0022-oshun-studio-cross-domain-entity-model.md
  • docs/releases/v1/specs/studio-cross-domain-entity-model-dependency-and-data-contract-map.md

Purpose#

Define primary journeys and deterministic edge-case behavior for cross-domain entity-model governance.

This document is the execution artifact for OST-00075.

Personas#

  • Program Operator
  • Domain Integrator
  • Data Steward
  • Security Reviewer
  • Reliability Engineer

Journey Principles#

  1. Entity identity must remain stable and immutable once published.
  2. Entity resolution must map deterministically to routes/actions.
  3. Cross-domain relations must preserve lineage and traceability.
  4. Compatibility changes must be explicit, versioned, and recoverable.

1. Primary Journeys#

J1. Canonical Entity Envelope Publication#

Goal: Publish a new canonical entity-model schema bundle.

Entry: Studio -> Cross-Domain Entity Model -> Schema Pipeline

Steps:

  1. Draft entity envelope updates.
  2. Validate required fields and identity constraints.
  3. Validate extension namespace and version compliance.
  4. Publish schema bundle to preview channel.
  5. Attach rollback reference and audit evidence.

Success State:

  • New entity envelope schema is published and validated.

J2. Cross-Domain Entity Resolution Validation#

Goal: Validate entity -> route/action mappings across domains.

Entry: Studio -> Cross-Domain Entity Model -> Resolution Validation

Steps:

  1. Select target entity types and domains.
  2. Run route/action mapping checks.
  3. Validate required context and fallback behavior.
  4. Remediate mapping failures.
  5. Re-run until pass.

Success State:

  • Resolution validation passes with deterministic route/action outcomes.

J3. Entity Relation Graph Sync#

Goal: Synchronize cross-domain entity relation graph consistency.

Entry: Studio -> Cross-Domain Entity Model -> Relation Graph

Steps:

  1. Generate relation integrity report.
  2. Resolve orphaned or cyclic invalid relations.
  3. Re-sync canonical relation graph.
  4. Validate lineage trace continuity.
  5. Attach relation sync evidence.

Success State:

  • Relation graph integrity passes for all governed domains.

J4. Compatibility and Migration Approval#

Goal: Approve schema changes with compatibility and migration checks.

Entry: Review & Approvals

Steps:

  1. Review compatibility matrix and breaking changes.
  2. Verify migration strategy and rollback version.
  3. Validate policy and approver requirements.
  4. Approve/reject with rationale.
  5. Promote to production if approved.

Success State:

  • Approved entity schema release is promoted with complete evidence.

J5. Entity Model Incident Rollback#

Goal: Recover from production entity-model regression.

Entry: Observability alert or user escalation

Steps:

  1. Identify failing schema version and impacted entity types.
  2. Roll back to last certified schema bundle.
  3. Validate entity resolution and lineage recovery.
  4. Freeze problematic schema release.
  5. Publish incident analysis and mitigation actions.

Success State:

  • Stable entity behavior is restored with traceable incident evidence.

2. Critical Edge Cases#

E1. Duplicate Entity ID Collision#

  • Trigger: new entity envelope reuses existing entityId.
  • Required behavior: fail validation and block publish.

E2. Missing Required Envelope Fields#

  • Trigger: entity payload missing required canonical fields.
  • Required behavior: reject payload with field-level diagnostics.

E3. Invalid Domain Attribution#

  • Trigger: entity references unknown or mismatched domain.
  • Required behavior: fail validation and require authoritative domain mapping.

E4. Broken Route Resolution#

  • Trigger: entity type has no valid route/action contract.
  • Required behavior: block release and provide resolution diagnostics.

E5. Relation Graph Cycle Violation#

  • Trigger: relation sync introduces prohibited cycles.
  • Required behavior: fail sync and identify violating edges.

E6. Orphaned Relation Targets#

  • Trigger: relation target entity does not exist.
  • Required behavior: quarantine relation and block promotion.

E7. Compatibility Regression#

  • Trigger: schema change breaks backward/forward compatibility policy.
  • Required behavior: block release and require version/migration remediation.

E8. Telemetry/Audit Emission Failure#

  • Trigger: entity lifecycle events fail to emit.
  • Required behavior: retry, expose degraded observability, reconcile buffered events.

E9. Unauthorized Entity Model Mutation#

  • Trigger: actor lacks permission for schema/relation changes.
  • Required behavior: deny action, emit policy audit event.

E10. Missing Rollback Version#

  • Trigger: release package lacks rollback schema reference.
  • Required behavior: block production promotion.

3. Journey-to-Surface Mapping#

Journey Primary Surface Supporting Surfaces
J1 Canonical Entity Envelope Publication Cross-Domain Entity Model Governance
J2 Cross-Domain Entity Resolution Validation Cross-Domain Entity Model Navigation/Commands
J3 Entity Relation Graph Sync Cross-Domain Entity Model Observability
J4 Compatibility and Migration Approval Review & Approvals Governance
J5 Entity Model Incident Rollback Observability Cross-Domain Entity Model

4. Instrumentation Requirements#

Required events:

  • entity_model.journey.started
  • entity_model.journey.step.completed
  • entity_model.journey.blocked
  • entity_model.journey.recovered
  • entity_model.journey.completed

Required dimensions:

  • programId, projectId, workspaceId
  • journeyId, stepId, entityType, schemaVersion
  • actorRole, outcome, latencyMs, errorCode

5. Acceptance Criteria (OST-00075)#

OST-00075 is complete only when:

  1. At least five cross-domain entity journeys are documented.
  2. At least ten deterministic edge cases are documented.
  3. Journey-to-surface mapping is explicit.
  4. Instrumentation requirements and dimensions are documented.