Status: Active
Owner: OSHUN Studio Product Design + Web Engineering
Last Updated: 2026-02-23
Related:
docs/adr/ADR-0014-oshun-studio-design-language-and-visual-identity.mddocs/releases/v1/specs/studio-design-language-dependency-and-data-contract-map.md
Purpose#
Define primary user journeys and edge-case behavior for design language and visual identity governance in OSHUN Studio.
This document is the execution artifact for OST-00011.
Personas#
- Design System Lead
- Brand Director
- Accessibility Lead
- Technical Director
- Program Reviewer
Journey Principles#
- Visual change workflows must be reviewable, not opaque.
- Every operation must preserve Studio context.
- Failed validations must provide deterministic recovery actions.
- Visual consistency must remain compatible with domain-specific context cues.
1. Primary Journeys#
J1. Token Bundle Publication#
Goal: Publish a new design token bundle for Studio surfaces.
Entry: Studio -> Design Language -> Token Pipeline
Steps:
- Open current bundle and clone as draft.
- Apply token edits (semantic, typography, motion, spacing).
- Run pre-flight validation (schema + semantic checks).
- Publish to preview channel with traceable version.
- Record audit events and update SLO telemetry.
Success State:
- New immutable bundle version exists.
- Preview channel consumes updated bundle.
- Audit events and latency metrics are recorded.
J2. Domain Identity Synchronization#
Goal: Propagate approved domain visual identity mappings.
Entry: Studio -> Design Language -> Domain Identity
Steps:
- Load current domain identity matrix.
- Update accent, label, or emphasis rules for target domains.
- Validate emphasis constraints and text-on-accent accessibility.
- Sync mappings across Studio surfaces.
- Confirm parity report for Yemaya/Isis/Hathor/Aja/Bellona contexts.
Success State:
- All domain identity records are versioned and synchronized.
- Parity report indicates no drift.
J3. Accessibility Certification#
Goal: Certify visual release readiness before production publish.
Entry: Studio -> Design Language -> Certification
Steps:
- Select token bundle version.
- Execute contrast and reduced-motion validation.
- Review violations and remediation suggestions.
- Re-run certification after fixes.
- Sign and attach certification evidence to release package.
Success State:
- Certification status is
pass. - Evidence bundle is attached and searchable.
J4. Production Release Approval#
Goal: Move certified visual bundle into production channel.
Entry: Studio -> Review & Approvals
Steps:
- Open release package with diff summary and certifications.
- Review approval matrix and policy checks.
- Approve or reject with rationale.
- If approved, promote bundle and record rollback target.
- Notify dependent surfaces.
Success State:
- Release is promoted with signed approvals.
- Rollback reference is available.
J5. Incident Rollback and Recovery#
Goal: Recover quickly from a visual regression in production.
Entry: Observability alert or design incident timeline.
Steps:
- Identify faulty bundle and impacted surfaces.
- Trigger rollback to prior certified version.
- Verify recovery via smoke checks.
- Create post-incident report with root-cause metadata.
- Lock problematic bundle until remediation.
Success State:
- Stable visual state restored.
- Incident evidence and corrective actions are recorded.
2. Critical Edge Cases#
E1. Incomplete Context#
- Trigger: missing
programId,projectId, orworkspaceId. - Behavior: block execution, require context repair, emit audit error.
E2. Unauthorized Publish Attempt#
- Trigger: non-authorized role attempts token publish.
- Behavior: deny action with reason, provide escalation path, audit denial.
E3. Token Schema Validation Failure#
- Trigger: invalid token shape or unsupported semantic key.
- Behavior: fail fast, show diagnostics, preserve draft.
E4. Accessibility Violation on Certification#
- Trigger: contrast or reduced-motion checks fail.
- Behavior: block release and require remediation.
E5. Domain Identity Drift#
- Trigger: domain mapping differs across surfaces.
- Behavior: block sync completion, show parity mismatch report.
E6. Telemetry Sink Failure#
- Trigger: analytics/audit sink unavailable.
- Behavior: retry with backoff, mark degraded observability state.
E7. Approval Deadlock#
- Trigger: required approvers conflict or are unavailable.
- Behavior: invoke escalation and delegated approval policy.
E8. Rollback Artifact Missing#
- Trigger: release package lacks rollback reference.
- Behavior: block production promotion.
E9. Partial Publish Success#
- Trigger: preview publish succeeds but one surface fails hydration.
- Behavior: mark release as partial, provide retryable reconciliation.
E10. Excessive Publish Latency#
- Trigger: publish flow exceeds SLO threshold.
- Behavior: alert operators and capture diagnostic snapshots.
3. Journey-to-Surface Mapping#
| Journey | Primary Surface | Supporting Surfaces |
|---|---|---|
| J1 Token Bundle Publication | Design Language | Observability |
| J2 Domain Identity Synchronization | Design Language | Programs, Projects |
| J3 Accessibility Certification | Design Language | Governance |
| J4 Production Release Approval | Review & Approvals | Governance, Observability |
| J5 Incident Rollback and Recovery | Observability | Design Language, Governance |
4. Instrumentation Requirements#
Required events per journey:
design.journey.starteddesign.journey.step.completeddesign.journey.blockeddesign.journey.recovereddesign.journey.completed
Required dimensions:
programId,projectId,workspaceIdjourneyId,stepId,bundleVersionactorRole,outcome,latencyMs,errorCode
5. Acceptance Criteria (OST-00011)#
OST-00011 is complete only when:
- At least five design-language journeys are documented.
- At least ten critical edge cases include deterministic behavior.
- Journey-to-surface mapping is explicit.
- Instrumentation requirements are defined with required dimensions.