Eve library

OSHUN Studio Design Language Journeys and Edge Cases

Spec

Revision 1

On this page

Status: Active
Owner: OSHUN Studio Product Design + Web Engineering
Last Updated: 2026-02-23
Related:

  • docs/adr/ADR-0014-oshun-studio-design-language-and-visual-identity.md
  • docs/releases/v1/specs/studio-design-language-dependency-and-data-contract-map.md

Purpose#

Define primary user journeys and edge-case behavior for design language and visual identity governance in OSHUN Studio.

This document is the execution artifact for OST-00011.

Personas#

  • Design System Lead
  • Brand Director
  • Accessibility Lead
  • Technical Director
  • Program Reviewer

Journey Principles#

  1. Visual change workflows must be reviewable, not opaque.
  2. Every operation must preserve Studio context.
  3. Failed validations must provide deterministic recovery actions.
  4. Visual consistency must remain compatible with domain-specific context cues.

1. Primary Journeys#

J1. Token Bundle Publication#

Goal: Publish a new design token bundle for Studio surfaces.

Entry: Studio -> Design Language -> Token Pipeline

Steps:

  1. Open current bundle and clone as draft.
  2. Apply token edits (semantic, typography, motion, spacing).
  3. Run pre-flight validation (schema + semantic checks).
  4. Publish to preview channel with traceable version.
  5. Record audit events and update SLO telemetry.

Success State:

  • New immutable bundle version exists.
  • Preview channel consumes updated bundle.
  • Audit events and latency metrics are recorded.

J2. Domain Identity Synchronization#

Goal: Propagate approved domain visual identity mappings.

Entry: Studio -> Design Language -> Domain Identity

Steps:

  1. Load current domain identity matrix.
  2. Update accent, label, or emphasis rules for target domains.
  3. Validate emphasis constraints and text-on-accent accessibility.
  4. Sync mappings across Studio surfaces.
  5. Confirm parity report for Yemaya/Isis/Hathor/Aja/Bellona contexts.

Success State:

  • All domain identity records are versioned and synchronized.
  • Parity report indicates no drift.

J3. Accessibility Certification#

Goal: Certify visual release readiness before production publish.

Entry: Studio -> Design Language -> Certification

Steps:

  1. Select token bundle version.
  2. Execute contrast and reduced-motion validation.
  3. Review violations and remediation suggestions.
  4. Re-run certification after fixes.
  5. Sign and attach certification evidence to release package.

Success State:

  • Certification status is pass.
  • Evidence bundle is attached and searchable.

J4. Production Release Approval#

Goal: Move certified visual bundle into production channel.

Entry: Studio -> Review & Approvals

Steps:

  1. Open release package with diff summary and certifications.
  2. Review approval matrix and policy checks.
  3. Approve or reject with rationale.
  4. If approved, promote bundle and record rollback target.
  5. Notify dependent surfaces.

Success State:

  • Release is promoted with signed approvals.
  • Rollback reference is available.

J5. Incident Rollback and Recovery#

Goal: Recover quickly from a visual regression in production.

Entry: Observability alert or design incident timeline.

Steps:

  1. Identify faulty bundle and impacted surfaces.
  2. Trigger rollback to prior certified version.
  3. Verify recovery via smoke checks.
  4. Create post-incident report with root-cause metadata.
  5. Lock problematic bundle until remediation.

Success State:

  • Stable visual state restored.
  • Incident evidence and corrective actions are recorded.

2. Critical Edge Cases#

E1. Incomplete Context#

  • Trigger: missing programId, projectId, or workspaceId.
  • Behavior: block execution, require context repair, emit audit error.

E2. Unauthorized Publish Attempt#

  • Trigger: non-authorized role attempts token publish.
  • Behavior: deny action with reason, provide escalation path, audit denial.

E3. Token Schema Validation Failure#

  • Trigger: invalid token shape or unsupported semantic key.
  • Behavior: fail fast, show diagnostics, preserve draft.

E4. Accessibility Violation on Certification#

  • Trigger: contrast or reduced-motion checks fail.
  • Behavior: block release and require remediation.

E5. Domain Identity Drift#

  • Trigger: domain mapping differs across surfaces.
  • Behavior: block sync completion, show parity mismatch report.

E6. Telemetry Sink Failure#

  • Trigger: analytics/audit sink unavailable.
  • Behavior: retry with backoff, mark degraded observability state.

E7. Approval Deadlock#

  • Trigger: required approvers conflict or are unavailable.
  • Behavior: invoke escalation and delegated approval policy.

E8. Rollback Artifact Missing#

  • Trigger: release package lacks rollback reference.
  • Behavior: block production promotion.

E9. Partial Publish Success#

  • Trigger: preview publish succeeds but one surface fails hydration.
  • Behavior: mark release as partial, provide retryable reconciliation.

E10. Excessive Publish Latency#

  • Trigger: publish flow exceeds SLO threshold.
  • Behavior: alert operators and capture diagnostic snapshots.

3. Journey-to-Surface Mapping#

Journey Primary Surface Supporting Surfaces
J1 Token Bundle Publication Design Language Observability
J2 Domain Identity Synchronization Design Language Programs, Projects
J3 Accessibility Certification Design Language Governance
J4 Production Release Approval Review & Approvals Governance, Observability
J5 Incident Rollback and Recovery Observability Design Language, Governance

4. Instrumentation Requirements#

Required events per journey:

  • design.journey.started
  • design.journey.step.completed
  • design.journey.blocked
  • design.journey.recovered
  • design.journey.completed

Required dimensions:

  • programId, projectId, workspaceId
  • journeyId, stepId, bundleVersion
  • actorRole, outcome, latencyMs, errorCode

5. Acceptance Criteria (OST-00011)#

OST-00011 is complete only when:

  1. At least five design-language journeys are documented.
  2. At least ten critical edge cases include deterministic behavior.
  3. Journey-to-surface mapping is explicit.
  4. Instrumentation requirements are defined with required dimensions.