# OSHUN Studio Notification Center Journeys and Edge Cases

Status: Active  
Owner: OSHUN Studio Architecture + OSHUN Web + OSHUN BFF + OSHUN Security  
Last Updated: 2026-02-23  
Related:

- `docs/adr/ADR-0030-oshun-studio-notification-center.md`
- `docs/releases/v1/specs/studio-notification-center-dependency-and-data-contract-map.md`

## Purpose

Define primary journeys and deterministic edge-case behavior for Studio
notification center governance.

This document is the execution artifact for `OST-00139`.

## Personas

- Program Operator
- Security Reviewer
- Domain Integrator
- Reliability Engineer
- Compliance Auditor

## Journey Principles

1. Critical notifications must be visible, actionable, and escalatable.
2. Notification state transitions must be deterministic and auditable.
3. Deduplication must reduce noise without losing signal integrity.
4. Triage workflows must preserve context and accountability.

## 1. Primary Journeys

### J1. Notification Feed Triage and Prioritization

**Goal**: Triage incoming notifications by severity, domain, and recency.

**Entry**: `Studio -> Notification Center`

**Steps**:

1. Load notification feed with priority ordering.
2. Apply filters for severity/domain/state.
3. Review summary + context links.
4. Select highest-priority actionable items.
5. Move items into acknowledgement/assignment workflows.

**Success State**:

- Operator can quickly identify and act on critical signals.

### J2. Acknowledge and Assign Workflow

**Goal**: Acknowledge ownership and assign notifications to responders.

**Entry**: `Selected actionable notification`

**Steps**:

1. Acknowledge notification.
2. Assign to responsible owner/role.
3. Add handling notes/context.
4. Confirm state transition to assigned.
5. Emit workflow audit evidence.

**Success State**:

- Notification ownership is explicit and tracked.

### J3. Resolve and Close Notification Loop

**Goal**: Resolve notification once remediation is complete.

**Entry**: `Assigned notification with remediation complete`

**Steps**:

1. Validate remediation evidence.
2. Mark notification resolved.
3. Attach closure rationale.
4. Confirm no unresolved dependencies remain.
5. Emit closure audit record.

**Success State**:

- Notification lifecycle is closed with traceable evidence.

### J4. Escalation of Unresolved Critical Alerts

**Goal**: Escalate unresolved critical notifications automatically or manually.

**Entry**: `Critical notification timeout` or `Manual escalation`

**Steps**:

1. Detect escalation trigger.
2. Route escalation to target channel/on-call.
3. Record escalation metadata.
4. Track acknowledgement status.
5. Close escalation after incident handoff.

**Success State**:

- Critical alerts are escalated deterministically with ownership trace.

### J5. Deduplication and Signal Integrity Review

**Goal**: Validate deduplicated notifications preserve actionable context.

**Entry**: `High-volume duplicate signal burst`

**Steps**:

1. Evaluate dedupe key and grouping policy.
2. Collapse duplicate notifications.
3. Preserve count and latest context.
4. Verify grouped item remains actionable.
5. Record dedupe decision evidence.

**Success State**:

- Noise is reduced while preserving operational signal integrity.

## 2. Critical Edge Cases

### E1. Missing Notification ID

- Trigger: incoming payload missing `notificationId`.
- Required behavior: reject payload and emit ingestion error.

### E2. Invalid Severity Classification

- Trigger: payload severity outside supported enum.
- Required behavior: route to fallback class and flag schema error.

### E3. Duplicate Deduplication Key Collision

- Trigger: unrelated notifications share same dedupe key.
- Required behavior: prevent merge and escalate dedupe-rule review.

### E4. Unauthorized Acknowledge Attempt

- Trigger: actor lacks permission to acknowledge notification.
- Required behavior: deny action and preserve state.

### E5. Unauthorized Assignment Attempt

- Trigger: actor assigns notification without entitlement.
- Required behavior: deny action and surface policy guidance.

### E6. Resolve Without Evidence

- Trigger: resolve action submitted without remediation evidence.
- Required behavior: block resolve and require closure context.

### E7. Escalation Channel Unavailable

- Trigger: escalation target channel not reachable.
- Required behavior: retry and route to fallback escalation path.

### E8. Escalation Looping

- Trigger: same notification repeatedly escalated without state change.
- Required behavior: enforce escalation cooldown and manual review.

### E9. Telemetry/Audit Emission Failure

- Trigger: notification lifecycle events fail to emit.
- Required behavior: buffer/retry and surface degraded observability warning.

### E10. Missing Rollback Reference for Notification Release

- Trigger: notification-center release lacks rollback contract reference.
- Required behavior: block production promotion.

## 3. Journey-to-Surface Mapping

| Journey                                        | Primary Surface     | Supporting Surfaces  |
| ---------------------------------------------- | ------------------- | -------------------- |
| J1 Notification Feed Triage and Prioritization | Notification Center | Domain emitters      |
| J2 Acknowledge and Assign Workflow             | Notification Center | Assignment services  |
| J3 Resolve and Close Notification Loop         | Notification Center | Governance workflows |
| J4 Escalation of Unresolved Critical Alerts    | Notification Center | Incident response    |
| J5 Deduplication and Signal Integrity Review   | Notification Center | BFF dedupe engine    |

## 4. Instrumentation Requirements

Required events:

- `notification_center.journey.started`
- `notification_center.journey.step.completed`
- `notification_center.journey.blocked`
- `notification_center.journey.recovered`
- `notification_center.journey.completed`

Required dimensions:

- `notificationId`, `actorId`, `actorRole`
- `journeyId`, `stepId`, `severity`, `dedupeKey`
- `outcome`, `latencyMs`, `errorCode`

## 5. Acceptance Criteria (OST-00139)

`OST-00139` is complete only when:

1. At least five notification-center journeys are documented.
2. At least ten deterministic edge cases are documented.
3. Journey-to-surface mapping is explicit.
4. Instrumentation requirements and dimensions are documented.
