Eve library

OSHUN Studio SDK and Documentation Integration Journeys and Edge Cases

Spec

Revision 1

On this page

Status: Active
Owner: OSHUN Studio Architecture + OSHUN Web + OSHUN BFF + OSHUN Developer Experience + OSHUN Security + Platform SRE + OSHUN Data/Analytics Engineering
Last Updated: 2026-02-23
Related:

  • docs/adr/ADR-0048-oshun-studio-sdk-and-documentation-integration.md
  • docs/releases/v1/specs/studio-sdk-and-documentation-integration-dependency-and-data-contract-map.md

Purpose#

Define primary journeys and deterministic edge-case behavior for Studio SDK and documentation integration workflows.

This document is the execution artifact for OST-00283.

Personas#

  • Integration Engineer
  • SDK Maintainer
  • Documentation Maintainer
  • Security Reviewer
  • Compliance Auditor
  • Release Manager

Journey Principles#

  1. Contract authority must drive SDK and documentation artifacts.
  2. SDK and docs publication must be versioned, traceable, and reversible.
  3. Example snippets must be validated against active contract versions.
  4. Sensitive production publication paths require role/tier/approval controls.

1. Primary Journeys#

J1. Promote Contract Version and Initialize Integration Pipeline#

Goal: Promote a validated contract version that triggers synchronized SDK and documentation generation workflows.

Entry: SDK/documentation integration workspace

Steps:

  1. Select domain/service contract candidate.
  2. Validate contract digest, schema compatibility, and migration notes.
  3. Promote contract to active lifecycle state.
  4. Trigger SDK and docs generation pipelines.
  5. Emit contract-promotion governance audit event.

Success State:

  • Active contract version is registered and downstream generation workflows are initialized.

J2. Generate and Publish Versioned SDK Artifact#

Goal: Produce a deterministic SDK artifact for target language/runtime.

Entry: Contract promotion completion

Steps:

  1. Select target SDK language/package profile.
  2. Generate typed client from active contract source.
  3. Run SDK validation suite (typing, smoke tests, compatibility checks).
  4. Publish artifact to scoped package channel.
  5. Emit SDK publication telemetry and audit evidence.

Success State:

  • SDK package is published with contract-linked metadata and validation evidence.

J3. Assemble and Publish Documentation Release#

Goal: Publish API reference, guides, and code samples synchronized with SDK and contract versions.

Entry: SDK generation success

Steps:

  1. Assemble reference docs and migration notes from contract metadata.
  2. Generate/update language-specific SDK usage examples.
  3. Validate samples against generated SDK and active contract.
  4. Publish docs to target channel (preview/staging/production).
  5. Emit documentation publication and validation audit evidence.

Success State:

  • Documentation release is published with contract-aligned API/reference/sample integrity.

J4. Decide Sensitive Publication or Rollback Action#

Goal: Govern production publish/rollback actions with explicit policy controls.

Entry: Production publish request or Incident-driven rollback request

Steps:

  1. Evaluate actor role, tier, and release-channel scope.
  2. Validate approval prerequisites for production actions.
  3. Allow or deny action with reason code.
  4. Persist decision evidence for compliance.
  5. Emit policy decision telemetry and audit event.

Success State:

  • Sensitive publication actions are governed, reason-coded, and compliance-ready.

J5. Recover SDK/Documentation Drift and Close Incident#

Goal: Resolve doc/sdk/contract drift and safely restore healthy release state.

Entry: Open integration consistency incident

Steps:

  1. Correlate drift signals (contract mismatch, sample failures, package skew).
  2. Apply mitigation (republish, rollback, cache invalidation, patch release).
  3. Re-run SDK/doc validation suite.
  4. Confirm telemetry and audit continuity restoration.
  5. Close incident with post-recovery evidence.

Success State:

  • Integration consistency is restored and incident closure is evidence-backed.

2. Critical Edge Cases#

E1. Contract Promotion Missing Digest#

  • Trigger: promotion request omits contract digest/identity.
  • Required behavior: hard deny with contract-validation reason code.

E2. Breaking Contract Without Migration Notes#

  • Trigger: breaking schema change has no migration guidance.
  • Required behavior: block promotion and require migration artifact.

E3. SDK Generation Completes With Type Errors#

  • Trigger: generated client compile/type checks fail.
  • Required behavior: mark generation as failed and block publication.

E4. SDK Publish Version Conflict#

  • Trigger: package version already exists in target channel.
  • Required behavior: deny publish and require explicit version bump.

E5. Documentation Release Missing API Reference Section#

  • Trigger: docs bundle excludes required API reference artifacts.
  • Required behavior: fail publication and require complete bundle.

E6. Code Sample Contract Drift#

  • Trigger: sample execution fails against active contract or SDK version.
  • Required behavior: block docs promotion and require sample remediation.

E7. Production Publish Without CAB/Approval Ticket#

  • Trigger: production publish requested without required approval evidence.
  • Required behavior: hard deny and emit policy-denial audit event.

E8. Unauthorized Restricted-Tier Rollback Request#

  • Trigger: actor without restricted permissions requests rollback.
  • Required behavior: deny action and preserve current release state.

E9. Artifact Repository Degradation#

  • Trigger: package/docs registry unavailable during publication.
  • Required behavior: mark degraded-release state and pause promotions.

E10. Telemetry or Audit Sink Failure#

  • Trigger: publish succeeds but telemetry/audit evidence cannot persist.
  • Required behavior: flag degraded observability and block production promotion.

3. Journey-to-Surface Mapping#

Journey Primary Surface Supporting Surfaces
J1 Promote Contract and Initialize Pipeline Contract governance panel Schema registry + migration policy validators
J2 Generate and Publish SDK Artifact SDK generation panel Build/test pipelines + package registry
J3 Assemble and Publish Documentation Documentation release panel Docs assembler + sample validation harness
J4 Decide Sensitive Publish/Rollback Publication policy panel RBAC/tier engine + approval governance
J5 Recover SDK/Docs Drift Incident recovery panel Telemetry dashboards + rollback/republish orchestration

4. Instrumentation Requirements#

Required events:

  • sdk_docs_integration.journey.started
  • sdk_docs_integration.journey.step.completed
  • sdk_docs_integration.journey.blocked
  • sdk_docs_integration.journey.validation_failed
  • sdk_docs_integration.journey.recovered
  • sdk_docs_integration.journey.completed

Required dimensions:

  • contractId, contractVersion, contractDigest, domain, service
  • artifactId, artifactType, packageName, packageVersion, docVersion
  • generationId, publicationId, sampleId, validationStatus
  • actorId, actorRole, permissionTier, releaseChannel, approvalTicket
  • journeyId, stepId, outcome, reasonCode, latencyMs

5. Acceptance Criteria (OST-00283)#

OST-00283 is complete only when:

  1. At least five SDK/documentation integration journeys are documented.
  2. At least ten deterministic edge cases are documented.
  3. Journey-to-surface mapping is explicit.
  4. Instrumentation requirements and dimensions are documented.