Purpose#
Define primary journeys and edge-case behavior for Studio spacing/layout-grid governance.
This document is the execution artifact for OST-00035.
Personas#
- Design System Lead
- UX Architect
- Accessibility Lead
- Technical Director
- Program Reviewer
Journey Principles#
- Layout spacing and grid changes must preserve scan rhythm.
- Dense operational surfaces must remain ergonomic and actionable.
- Responsive behavior must be deterministic across breakpoints.
- All changes must be tokenized and auditable.
1. Primary Journeys#
J1. Spacing Bundle Draft and Publish#
Goal: Publish new spacing/radius bundle to preview.
Entry: Studio -> Spacing & Layout -> Bundle Pipeline
Steps:
- Clone current spacing bundle.
- Apply spacing/radius updates.
- Run schema and token-usage checks.
- Publish to preview.
- Record telemetry/audit evidence.
Success State:
- Immutable spacing bundle version published and previewed.
J2. Layout Density Validation#
Goal: Validate density profiles for compact/standard/spacious modes.
Entry: Studio -> Spacing & Layout -> Density Validation
Steps:
- Select bundle version and target density profile.
- Run spacing and touch-target spacing checks.
- Run clipping/overflow checks.
- Review findings and remediate.
- Re-run until pass.
Success State:
- Density validation report status is
pass.
J3. Responsive Grid Profile Sync#
Goal: Sync grid breakpoints and gutter rules across domain surfaces.
Entry: Studio -> Spacing & Layout -> Grid Parity
Steps:
- Generate drift report by domain/surface.
- Apply canonical breakpoint/gutter mapping.
- Re-run parity checks.
- Confirm no critical drift.
- Attach parity evidence.
Success State:
- Grid parity status is
passacross target domains.
J4. Review and Production Promotion#
Goal: Promote validated layout-system release to production.
Entry: Review & Approvals
Steps:
- Review bundle diff + density/parity evidence.
- Verify policy and approver matrix.
- Approve/reject with rationale.
- Promote if approved.
- Confirm deployment and event completeness.
Success State:
- Release promoted with signed approval and full evidence.
J5. Layout Regression Rollback#
Goal: Recover from production spacing/layout regression.
Entry: Observability alert.
Steps:
- Identify failing layout bundle and impacted surfaces.
- Roll back to last certified version.
- Verify responsive and density recovery.
- Freeze problematic bundle.
- Publish post-incident analysis.
Success State:
- Stable layout rhythm restored and incident recorded.
2. Critical Edge Cases#
E1. Incomplete Context#
- Trigger: missing program/project/workspace IDs.
- Required behavior: block action and request context repair.
E2. Unauthorized Publish#
- Trigger: role lacks publish permission.
- Required behavior: deny with explicit reason and audit.
E3. Non-tokenized Spacing Usage#
- Trigger: raw spacing values detected.
- Required behavior: fail validation and show token-path diagnostics.
E4. Touch-Target Spacing Violation#
- Trigger: spacing violates ergonomics requirements.
- Required behavior: block release until fixed.
E5. Responsive Breakpoint Regression#
- Trigger: layout breaks at target viewport ranges.
- Required behavior: block promotion and require remediation.
E6. Overflow/Clipping Regression#
- Trigger: content clipping in dense views.
- Required behavior: fail density validation.
E7. Domain Grid Drift Persisting After Sync#
- Trigger: parity mismatch remains after sync.
- Required behavior: block release and show drift diagnostics.
E8. Telemetry Degradation#
- Trigger: missing audit/telemetry events.
- Required behavior: retry + degraded observability notice.
E9. Approval Deadlock#
- Trigger: approver conflict or absence.
- Required behavior: delegated approval path and SLA escalation.
E10. Missing Rollback Reference#
- Trigger: release package lacks rollback version.
- Required behavior: block production promotion.
3. Journey-to-Surface Mapping#
| Journey | Primary Surface | Supporting Surfaces |
|---|---|---|
| J1 Spacing Bundle Draft and Publish | Spacing & Layout | Observability |
| J2 Layout Density Validation | Spacing & Layout | Governance |
| J3 Responsive Grid Profile Sync | Spacing & Layout | Programs, Projects |
| J4 Review and Production Promotion | Review & Approvals | Governance |
| J5 Layout Regression Rollback | Observability | Spacing & Layout, Governance |
4. Instrumentation Requirements#
Required events:
layout.journey.startedlayout.journey.step.completedlayout.journey.blockedlayout.journey.recoveredlayout.journey.completed
Required dimensions:
programId,projectId,workspaceIdjourneyId,stepId,bundleVersionactorRole,outcome,latencyMs,errorCode
5. Acceptance Criteria (OST-00035)#
OST-00035 is complete only when:
- At least five spacing/layout journeys are documented.
- At least ten critical edge cases with deterministic behavior are documented.
- Journey-to-surface mapping is explicit.
- Instrumentation requirements and dimensions are documented.