Disciplines · Training

Training — Product

launch responsibility.

9sections3 minread

On this page

Product training covers launch-metric ownership, content readiness, incident communication, customer-impact decision-making, and the product-side of release gates. Distinct from launch-support training (which covers canary-monitoring and rollout operations).

Audience and prerequisites#

  • Audience: product managers, design leads, and product-marketing leads with launch responsibility.
  • Prerequisites: domain-foundations module per domain owned, customer taxonomy familiarity (customer-taxonomy.ts), release-taxonomy familiarity (release-taxonomy.ts), audit-scope familiarity.
  • Refresh cadence: 6 months; per-release readiness brief mandatory.

Learning objectives#

By certification, a product lead can independently:

  1. Define and track launch metrics per domain (activation, retention, cross-domain use, satisfaction, trust, safety, accessibility).
  2. Assess content readiness per docs/content/v1-bundles.md and the per-domain review checklists.
  3. Compose customer-visible incident communications using the canonical templates from incident-ownership-manifest.ts, in collaboration with reliability, T&S, and legal.
  4. Make customer-impact decisions (degraded mode, kill-switch, rollback communication) under time pressure with the appropriate co-signers.
  5. Run the product-side of the release-gate checklist.
  6. Translate customer signal (support, message-center, T&S queues, research) into structured product remediation.

Curriculum modules#

# Module Duration Format Assessment
1 Launch metrics and KPIs per domain 120 min seminar + dashboard walkthrough 6-domain KPI interpretation pass
2 Content readiness and the launch-quality bundles 120 min hands-on with bundle definitions per-domain bundle readiness drill
3 Customer-impact decision-making 120 min scenario rehearsal 4-scenario decision drill
4 Incident communication composition (joint w/ relicab) 90 min drafting workshop 3 incident-comms drafts pass rubric
5 Release-gate product checklist 90 min hands-on against go/no-go fixtures 2-release readiness drill
6 Cross-domain product coordination 60 min scenario rehearsal 2-coordination drill
7 Privacy, safety, accessibility minimums 60 min seminar joint with privacy/T&S/access per-minimum interpretation pass
8 Customer-research interpretation 60 min hands-on with research artifacts 3-research-to-remediation drill

Launch-metric protocol#

Each product lead owns a launch-metric brief per domain that captures:

  • Activation, retention, and cross-domain-use targets.
  • Domain-specific quality KPIs (grounding precision for Veritas, ritual completion rate for Tara, etc.).
  • Satisfaction, trust, and safety metrics (CSAT, trust index, refusal appropriateness, disclosure render rate).
  • Accessibility and locale gates (RTL coverage, transcript availability, reduced-motion render rate).
  • Cost-class metrics (per-session cost envelope, generation cost per cohort).

The brief is reviewed at each release-readiness gate.

Customer-impact decision-making#

When an incident or release decision affects customers:

  1. Quantify the impact: cohort size, severity, time exposed, data-class implication.
  2. Identify the co-signers: reliability + product is the minimum; T&S, privacy, legal as the incident class requires.
  3. Choose the customer-visible action: status banner, in-app banner, email, push, retroactive correction. Use the canonical templates.
  4. Capture the audit: the decision is recorded as a structured product-decision audit event with operator, co-signers, scope, and reason code.
  5. Follow up: every customer-impact decision is followed by a product-side retrospective with the relevant domain lead.

Scenario rehearsal#

  1. Domain launch hold: a domain misses its accessibility gate. Product lead holds launch, files structured remediation, communicates with the executive sponsor.
  2. Customer-visible rollback comms: a model rollback affects grounded answers. Product lead drafts the customer-visible correction with T&S and reliability co-signers.
  3. Cross-domain regression: a shared infrastructure change degrades two domains simultaneously. Product lead coordinates joint communications and decision-making.
  4. Sensitive-data regression: a privacy-incident leaks special- category data for a small cohort. Product lead supports the privacy lead on the customer-visible remediation copy under legal review.

Certification criteria#

  • All 8 modules complete with passing assessment.
  • All 4 scenarios passed.
  • Product lead has co-led 2 release-readiness gates with a senior product lead.
  • Engineering lead, T&S lead, and privacy lead sign-off.

Tabletop drills#

  • Per-release: pre-release product readiness brief.
  • Quarterly: customer-impact decision drill alongside reliability.
  • Semiannually: cross-domain coordination tabletop.

Owner#

Product lead owns this training. Engineering lead, T&S lead, and privacy lead co-review the cross-cutting modules. Updates require review by all four.