Eve library

Portfolio completion admission boundary

Evidence

Revision 1

On this page

Date: 2026-07-27

Source commit: a123c89b4101cc431381af93389517cc8329510a

Outcome#

Section 13 now has one executable, fail-closed admission contract requiring all 12 portfolio completion gates to hold in the same fresh package and at the same source commit. The retained package is blocked on all 12 checks. It does not convert contracts, fixtures, hermetic tests, owned blockers, or component-level closure into a portfolio-complete claim.

Concurrent gate contract#

scripts/audit/verify-portfolio-completion-evidence.mjs requires fresh, non-fixture staging or production evidence for:

  1. every ledger task checked with a current pack and no unfilled or substituted seam;
  2. complete slot registration, released-or-owned-blocked accounting, and zero unknown shipped artifacts;
  3. passing typed safety, rights/consent/provenance, formal-validity, accessibility, runtime, and authority evidence;
  4. preregistered pass^5 >= 0.95 reliability across every critical deterministic task;
  5. all nine flagship comparisons with the required best-authored confidence bounds and stricter “amazing” thresholds;
  6. complete traceability for every released artifact;
  7. every operator action exercised through the deployed control plane without bypass or repeated effects;
  8. all nine recovery drills with perfect lineage and no duplicated effect;
  9. licensed-human-gold judge calibration plus exercised disagreement/OOD abstention or human routing;
  10. selective invalidation and recertification for every source-through- placement change axis;
  11. all nine production canaries passing all seven SLO classes with exercised rollback; and
  12. registry, generated documentation, audit evidence, and deployed observations agreeing at one commit and freshness window.

Each gate must carry its own receipt and nonempty SHA-256-bound artifact. A generic passing status cannot compensate for missing gate-specific facts.

Retained audit#

No coherent external package currently proves these facts concurrently. The canonical manifest therefore contains no gate records. Audit mode reports all 12 checks false; strict mode exits nonzero. Every Section 13 checkbox remains open pending the product, human, provider, deployment, operational, and governance work already identified by its owning evidence pack.

This boundary changes no user-facing UI, so Playwright, mobile, and UI accessibility automation are not applicable.