Date: 2026-02-22
Checklist Item: OPS-006
Ticket: ISIS-0241
Scope#
Operational governance coverage for post-incident learning and closure quality:
- Standardized review template specific to Isis generation failure and cost-overrun scenarios.
- Mandatory evidence, timeline, reliability metrics, and budget-impact sections.
- On-call runbook linkage to enforce usage during incident closure workflows.
Evidence Matrix#
| Requirement | Evidence | Status |
|---|---|---|
| Isis-specific post-incident review template exists | docs/domains/isis/remediation/ISIS_POST_INCIDENT_REVIEW_TEMPLATE.md provides a dedicated template for generation reliability incidents and RunPod cost overruns. |
Pass |
| Template captures generation failure diagnostics | Same template includes submit/queue/provider/worker/storage failure-path breakdown, SLI/SLO impact matrix, alert effectiveness analysis, and root-cause workflow sections. | Pass |
| Template captures cost overrun diagnostics | Same template includes dedicated cost-overrun analysis section (forecast vs actual, overrun drivers, guardrail transitions, control gaps, and recovered/avoided cost). | Pass |
| Corrective/preventive action tracking is enforceable | Same template includes structured CAPA table with owner/due-date/ticket fields plus validation and rollout/rollback plan requirements for closure. | Pass |
| On-call playbook references template as required post-incident artifact | docs/domains/isis/runbooks/runpod-oncall.md now includes an explicit post-incident review requirement section and links the template in related docs to ensure SEV-1/SEV-2 and cost-overrun events follow consistent closure. |
Pass |
Reproduction Commands#
bash
test -f docs/domains/isis/remediation/ISIS_POST_INCIDENT_REVIEW_TEMPLATE.md
rg -n "Post-Incident Review Requirement|ISIS_POST_INCIDENT_REVIEW_TEMPLATE.md" docs/domains/isis/runbooks/runpod-oncall.md