Eve library

OSHUN Studio Complex Interaction Patterns Journeys and Edge Cases

Spec

Revision 1

On this page

Status: Active
Owner: OSHUN Studio Product Design + Web Engineering
Last Updated: 2026-02-23
Related:

  • docs/adr/ADR-0019-oshun-studio-complex-interaction-patterns-and-state-orchestration.md
  • docs/releases/v1/specs/studio-complex-interaction-patterns-dependency-and-data-contract-map.md

Purpose#

Define primary journeys and edge-case behavior for Studio complex interaction pattern governance.

This document is the execution artifact for OST-00051.

Personas#

  • Design System Lead
  • Workflow Architect
  • Accessibility Lead
  • Technical Director
  • Program Reviewer

Journey Principles#

  1. Complex workflows must expose deterministic state transitions.
  2. Recovery behavior (retry/reset/rollback) must always be available.
  3. Parallel execution status must remain transparent and actionable.
  4. Accessibility semantics must survive all async transitions.

1. Primary Journeys#

J1. Orchestration Bundle Draft and Publish#

Goal: Publish a new interaction-orchestration bundle to preview.

Entry: Studio -> Complex Interaction Patterns -> Bundle Pipeline

Steps:

  1. Clone current orchestration bundle.
  2. Update workflow steps, transition rules, and timeout settings.
  3. Run schema and transition-integrity checks.
  4. Publish bundle to preview.
  5. Record telemetry/audit evidence and rollback baseline.

Success State:

  • Immutable orchestration bundle is published for preview.

J2. State Transition and Recovery Validation#

Goal: Validate transition determinism and recovery semantics.

Entry: Studio -> Complex Interaction Patterns -> Validation

Steps:

  1. Select bundle version and target workflow set.
  2. Run transition determinism checks.
  3. Run retry/reset/rollback path checks.
  4. Inspect violations and remediation guidance.
  5. Re-run until validation pass.

Success State:

  • Validation report status is pass.

J3. Parallel Execution and Timeout Certification#

Goal: Certify parallel task behavior and timeout/cancel handling.

Entry: Studio -> Complex Interaction Patterns -> Concurrency

Steps:

  1. Run parallel execution simulation.
  2. Inspect aggregate and per-task outcomes.
  3. Trigger timeout and cancel scenarios.
  4. Validate deterministic resolution behavior.
  5. Attach concurrency report to release package.

Success State:

  • Concurrency report status is pass.

J4. Domain Interaction Parity Sync#

Goal: Synchronize complex interaction behavior across domains.

Entry: Studio -> Complex Interaction Patterns -> Domain Parity

Steps:

  1. Generate drift report by domain and workflow.
  2. Apply canonical orchestration bundle references.
  3. Re-run parity checks.
  4. Confirm zero critical drift.
  5. Attach parity report to release evidence.

Success State:

  • Domain parity status is pass across all target domains.

J5. Production Promotion and Incident Rollback#

Goal: Promote validated bundle and recover quickly from production issues.

Entry: Review & Approvals or Observability alert.

Steps:

  1. Review validation + concurrency + parity evidence.
  2. Approve/reject promotion based on policy and evidence.
  3. Promote approved bundle to production.
  4. If regression occurs, execute rollback to certified version.
  5. Publish incident postmortem and mitigation actions.

Success State:

  • Either stable promotion completes or rollback restores stable behavior.

2. Critical Edge Cases#

E1. Incomplete Context#

  • Trigger: missing program/project/workspace identifiers.
  • Required behavior: block action and request context repair.

E2. Unauthorized Publish Attempt#

  • Trigger: role lacks publish permission.
  • Required behavior: deny with explicit policy reason and audit event.

E3. Invalid State Transition Definition#

  • Trigger: workflow step transitions are cyclic/illegal.
  • Required behavior: fail validation with transition-path diagnostics.

E4. Missing Recovery Action#

  • Trigger: flow has no retry/reset/rollback support.
  • Required behavior: block release until recovery contract is complete.

E5. Parallel Task Deadlock#

  • Trigger: one or more tasks remain unresolved past timeout threshold.
  • Required behavior: fail execution, mark timed-out tasks, surface remediation.

E6. Cancellation Semantics Drift#

  • Trigger: cancel action leaves workflow in inconsistent state.
  • Required behavior: block promotion and require deterministic cancel handler.

E7. Accessibility Focus Loss During Async Transition#

  • Trigger: focus is lost after pending-to-error or pending-to-success state.
  • Required behavior: fail accessibility checks with focus-path diagnostics.

E8. Persistent Domain Parity Drift#

  • Trigger: parity mismatch remains after sync.
  • Required behavior: block release and emit domain/workflow diagnostics.

E9. Telemetry/Audit Sink Degradation#

  • Trigger: telemetry or audit events fail to emit.
  • Required behavior: retry, expose degraded observability, reconcile buffered events.

E10. Missing Rollback Artifact#

  • Trigger: release package lacks rollback reference.
  • Required behavior: block production promotion.

3. Journey-to-Surface Mapping#

Journey Primary Surface Supporting Surfaces
J1 Orchestration Bundle Draft and Publish Complex Interaction Patterns Observability
J2 State Transition and Recovery Validation Complex Interaction Patterns Governance
J3 Parallel Execution and Timeout Certification Complex Interaction Patterns Observability
J4 Domain Interaction Parity Sync Complex Interaction Patterns Programs, Projects
J5 Production Promotion and Incident Rollback Review & Approvals Observability, Governance

4. Instrumentation Requirements#

Required events:

  • interaction.journey.started
  • interaction.journey.step.completed
  • interaction.journey.blocked
  • interaction.journey.recovered
  • interaction.journey.completed

Required dimensions:

  • programId, projectId, workspaceId
  • journeyId, stepId, bundleVersion
  • actorRole, outcome, latencyMs, errorCode

5. Acceptance Criteria (OST-00051)#

OST-00051 is complete only when:

  1. At least five complex-interaction journeys are documented.
  2. At least ten complex-interaction edge cases are documented with deterministic behavior.
  3. Journey-to-surface mapping is explicit.
  4. Instrumentation requirements and dimensions are documented.